My WebLink
|
Help
|
About
|
Sign Out
Home
2007-01-05 tginger
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2007
>
2007-01-05 tginger
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 8:43:04 AM
Creation date
6/13/2011 8:42:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IWASHITA: Thank you, Mr. Chair. I agree that a TIAR will be helpful for us to <br />evaluate this matter and that should be, in this particular case it just seems to me because of the <br />already challenging situations that occur there on a regular basis that that’s something that we <br />should consider requiring before proceeding with this particular application. <br />GRAHAM: Thank you. If that’s all, I’ll call the applicant forward. Thank you. I <br />believe I have one person signed up for public testimony. So when I swear in the applicant now <br />if anyone who’s going to give public testimony will stand in place, and I’ll ask you to raise your <br />hand too to do it all together. Okay, so would you all please raise your right hand. And do you <br />swear or affirm to tell the truth on this matter now before the Hawaii County Planning <br />Commission? <br />TESTIFIERS: Yes, I do. <br />GRAHAM: All right, thank you. At this point we’ll take a presentation from the <br />applicant and have questions, and thereafter we’ll take public testimony. <br />LIM: Thank you, Mr. Chairman and Members of the Commission. Steven Lim <br />with Carlsmith at PO Box 686 in Hilo. To my left is Mr. Jon Gomes who’s the manager of the <br />applicant, Ginger Patch DP, LLC. We’d also like to thank and acknowledge the presence of the <br />Shiroma family and the Miyashiro family seated to the rear of the room who are some of the, the <br />Shiroma family is the owner of the property and the Miyashiro family are adjoining property <br />owners. As you’ve seen from some of the materials that we submitted, the neighboring property <br />owners who would be the Kouchi family located right in the notch there of the project and the <br />Miyashiro family to the north expressed some concerns over screening the potential commercial <br />uses from the residential uses that they’ve had for years. And so the applicant and those families <br />have agreed to construct a 6-foot high stone wall/rock wall buffer along the northern property <br />boundary. And so we’ve received approval from them to represent that they have no problems <br />with the application. We have not received any other comments on the application from the <br />other surrounding owners. <br />We’ve reviewed the background report and recommendation by the Planning Department and the <br />conditions proposed for approval; and we have no objections to those. I think the issue on this <br />project has always been the traffic issue at that Kekela Street intersection. As you were going <br />through your discussion I was talking to Mr. Gomes and I think we understand the issue. We <br />would like the rezoning to proceed in an expeditious fashion to go forward to the County <br />Council. I think as you can see from our project proposal there the Prince Kuhio Mall side <br />entrance along Kekela Street is the one that would generate the left-turn movements potentially <br />towards Puainako, towards the Mall. I think that that’s what’s happening, I know that that’s <br />what happening already from the existing residents out there. <br />I think in our discussions we believe that, well, one thing that hasn’t happened is we have had no <br />objections, no comments about the entrance to the project along Puainako Street. It would <br />basically be as you’re coming from the mall towards the project, it will be a right-turn in and a <br />right-turn out only. We think that the project entrance at that site would be designed such that <br /> EXHIBIT B 7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.