Laserfiche WebLink
zoned districts. The green, darker green areas along Queen Kaahumanu Highway are areas that <br />are zoned open. We also have agriculture 5-acre zoned lands, these are lands that are within the <br />Keahole agricultural park. Also along Kaiminani Drive there are areas that are zoned for <br />residential and developed with residential lots or are proposed to be developed for residential <br />purposes. The brown shaded areas are areas that are designated multiple residential. There are <br />two lots are involved in this particular request. And if I may refer to this particular map which is <br />the overall Keahole Generating Station€s and airport substation plot plan. First of all there is a <br />small 0.6-acre property, which is the airport substation property. And the bigger area, which is <br />14.9 acres, which basically is the generating plant. The applicant recently went through a State <br />Land Use Boundary Amendment from a conservation to a urban designation with the Land Use <br />Commission. The Land Use Commission granted the request to urbanize the property to place <br />th <br />the property into the urban district and adopted their findings on November 7 of 2005. All of <br />you received a copy of the decision and order, which stated thenumerous conditions that the <br />applicant had to comply with. The Land Use designation for the County is the urban expansion <br />area. Rather than go into detail the overall project description I would like to defer that to the <br />applicant and they can explain it to the Commissioners as to what has been proposed. If you <br />look at the maps on the-, boards on the-, easel. It€s been a long day. The first one is a <br />photograph of the subject property and the current improvements on the property and next to it is <br />the overall property or site plan. And that€s similar to this particular map, site plan that€s on the <br />wall. The primary access to the property will be from or is from Pukiawe Street which comes-. <br />This is Pukiawe Street and this comes off of Kaiminani Drive. There€s also another access <br />which is referred to as the Reservoir Road and that€s an access that€s directly off of, directly <br />across of the airport access road. Water is available to the property and the wastewater system <br />will come from for domestic wastewater will be the septic tank and leach field and the industrial <br />wastes there will be two underground injection wells provided. We did receive 2 letters in <br />support of the request for zone change and 1 request, the first request was from the Keahole <br />Defense Coalition sent in by Keichi Ikeda. And the second is a letter from the Department of <br />Hawaiian Homelands and that one is dated January 10, 2006. I believe all of you have a copy of <br />those letters. The Planning Director is recommending approval of the zone change including <br />the-, zone change with conditions including the incorporation of the Land Use conditions that <br />were imposed by the Land Use Commission. We distributed amended conditions for the <br />Commissioner€s consideration. The first one or the first change if you look in the amended <br />condition is related to Condition C. And the reason why we did away with recommending that, <br />of deleting that particular condition and the reason for that is that the water commitment has <br />already been paid. In fact the property, the, obviously as all of you know the facilities already <br />exist on that particular property. And the second change will be an amendment to condition D, <br />and that would become a new condition C as a result of deleting condition C which we got in the <br />water. And that increases the construction timetable from 5 to 10 years. And the reason for the <br />change is that there are numerous permits, other permits that the applicant would have to obtain <br />before they can construct. These include the permits from the Environmental Protection Agency, <br />Department of Health, the State Water Commission as well as the DLNR. So the time for that <br />maybe lengthier than anticipated and this is why we increased the time from 5 to 10 years as to <br />the construction completion. And finally, on the floor we€d like to change condition D, that will <br />be the new condition D and the current, now the condition that is submitted to you was that the <br />applicant shall provide additional landscaping as set forth in the Landscaping Concept Plan. The <br />applicant has since installed those landscaping. So basically what we want to do is delete the <br />EXHIBIT G <br />2 <br /> <br />