Laserfiche WebLink
GRAHAM:Okay. If I continue on up above this road 5 which is the stub road it looks <br />like thats going through the forest preserve area. It seems to me an issue for a forest preserve to <br />keep it healthy and well would be fire potential and running a road through it probably adds to <br />fire potential and I think we got a Department of Agriculture letter, some federal department <br />saying they were unhappy with the idea of running a road through that reserve. Is that something <br />youve dealt with with them or am I misunderstanding something or? <br />YUEN:5 doesnt go through the forest preserve. Its easiest to look on the maps <br />next to Norman, in the middle map. <br />GRAHAM:Yeah. <br />YUEN:And the forest preserve is in green there to the left of that road. <br />GRAHAM:Isee. <br />YUEN:Andthen5goesofftotherightupthere. <br />GRAHAM:Okay. <br />YUEN:Andsoitdoesntgointotheforestpreserve.Theroadthatwould,thepart <br />of the main project access road that would connect to Makalei Drive does come very close to the <br />forest preserve and we have had a couple of meetings about how that can be handled. And it <br />looks like theres certainly theres a way to connect it. The ideal is hopefully theres a way to <br />connect it without creating a full stop you know that you can connect it on a curve. As far as the <br />fire, there is a fire break being, thats being constructed along the perimeter of the dry land <br />forest. It is, thats always part of the major threat, in an area like this but there would be a fire <br />break built. Theres a fire break built. <br />GRAHAM:Okay and in overall terms, the correspondence that I read from the <br />Department of Public Works sounded like they had a very live dispute with the Planning <br />Department about the roads and I think they were mostly the north-south lateral roads. Im <br />wondering if you and the Department of Public Works had sort of come into accord. That youre <br />both okay with the current plan that you had put forward here or whether theres still a <br />disagreement there? <br />YUEN:I dont think we have major disagreements over the north-south road. <br />Theres some issues of how much of it needs to be built at the present time. <br />GRAHAM:Thats just timing agreements not layout or-? <br />YUEN:(inaudible) the timing you know the layout is, this is. Well, what you may <br />be referring to is that theres a earlier letter from Department of Public Works that really has to <br />do with pushing all these roads through the property to the northern boundary. And the only <br />road that were mandating be pushed through to the northern boundary would be road 3. And so, <br />and in Public Works letter theyre talking about pushing road 2 to the norther boundary. We <br />EXHIBIT H <br />6 <br /> <br />