Laserfiche WebLink
rights to traverse the roadway easement and there are two existing driveways from <br /> Kalaoa Camp Road to each of the existing dwellings. A new driveway will be installed <br /> from Kalaoa Camp Road and will provide access to the third proposed dwelling. <br /> County water is available from an existing 4-inch waterline within Kalaoa Camp <br /> Road and the property is currently served via two (2), 5/8-inch water meters. According <br /> to the Department of Water Supply,there is one (1) additional unit of water available to <br /> the property the applicants will be required to install a new, 5/8-inch meter and related <br /> water system improvements and to serve the additional proposed lot. As mentioned <br /> above, a condition of approval will require the applicants to remove the roadway and <br /> utility easement from the total subdividable lot size to ensure that a fourth (4) lot cannot <br /> be created during the subdivision process,thus the proposed zoning will comply with the <br /> Zoning Code's Concurrency requirements related to water. <br /> The subject property is not currently serviced by the County sewer system. <br /> According to the applicants,wastewater is currently disposed of into existing,permitted <br /> cesspools for the existing single-family dwelling and existing additional farm dwelling. <br /> The proposed second additional farm dwelling will be serviced by a septic system <br /> meeting with the requirements of the Department of Health regulations. <br /> Solid waste will be disposed of at the nearby transfer station or Hilo landfill. <br /> Electricity and telephone are available to the property and police and fire services are <br /> available in Hilo. A condition of approval will be included to require the applicants to <br /> meet all applicable County, State and Federal laws,rules,regulations, and requirements. <br /> There are no severe geological or topographical problems for the property <br /> that cannot be properly rectified, or which would render the land unusable. <br /> According to the Flood Insurance Rate Map (FIRM)prepared by the Federal Emergency <br /> Management Agency (FEMA) and the Department of Public Works-Engineering <br /> Division (DPW),the property is located in Zone "X", an area outside of the 500-year <br /> flood area. There are no significant topographical constraints, and the property is not <br /> located in a flood zone. Conditions of approval will ensure that all development <br /> generated runoff will be disposed of onsite and that the applicant will comply with <br /> Chapter 10 related to Erosion and Sedimentation Control. <br /> -6- <br />