My WebLink
|
Help
|
About
|
Sign Out
Home
2009-01-22 TSAMSON
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2009
>
2009-01-22 TSAMSON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 9:51:54 AM
Creation date
6/13/2011 9:51:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the North Kona district. More specifically, we are looking at Hualalai Road that runs through the <br />middle of the map. We have Kuakini Highway that’s running north-south on the left side of the <br />map. The actual property itself is identified by a blue outline. This is just located very near the <br />middle of the Kailua town. <br />The applicant in this case – oh, I’m sorry, I wanted to show you an aerial – currently you can see <br />that the property is vacant of structures and uses. There are single family dwellings located to <br />the south as well as, I believe this is a retirement facility that is located just to the north of the <br />property. There is a, you can see the subdivisions that are surrounding the property. <br />The applicant is requesting a two-year time extension to Condition C to Change of Zone <br />Ordinances Nos. 06 137 and 06 138 to be able to secure final plan approval. The reason that the <br />applicant is actually here today is that the Ordinances require the applicant to secure final plan <br />approval within two years from the amendment date of these Ordinances; and that did not occur; <br />so the applicant had to come in for the time extension. They are also requesting a five-year time <br />extension for the same condition, which is the portion that requires them to complete <br />construction within five years. <br />This is a tentative site plan that was submitted prior by the applicant. It kind of shows you the <br />layout of the particular project. The project is going to consist of 146 multiple-family residential <br />units. This is what the elevation of the two-story building is going to look like, as well as the <br />three-story building. <br />The Planning Director is recommending that the Planning Commission send a favorable <br />recommendation for these time extension requests. Our Condition C, as you’ll notice, does not <br />have the time for the final plan approval; so we are just allowing the five-year time extension. <br />We are requesting that the Planning Commission send a favorable recommendation for <br />Condition C for just the five-year time extension to complete construction, so that the applicant <br />won’t be tied by this two-year time limit to have to secure final plan approval. <br />Additionally, this morning we received proposed conditions of approval from the applicant, <br />which has been submitted to the Planning Commission. Are there any questions? <br />WATANABE: Fellow Commissioners, do we have any questions of staff? Yes, Ms. <br />Bowman. <br />BOWMAN: Just looking over what was given us, are there changes? I mean I can’t see <br />the delineation of the changes that the applicant has -. <br />WATANABE: I believe that would be on the last -. <br />BOWMAN: Except for “additional” under C. Would they be underlined? I’m just <br />trying to compare. <br />DARROW: They are red. You’ll see the changes in red. <br />HOUSEL: Page 3. <br />EXHIBIT A <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.