My WebLink
|
Help
|
About
|
Sign Out
Home
2022-03-22 Kailua Village Design Commission Minutes
PublicDocuments
>
Planning Department
>
Kailua Village Design Commission
>
Minutes
>
2006-2024
>
2022
>
2022-03-22 Kailua Village Design Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2022 9:10:39 AM
Creation date
4/27/2022 9:10:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
kiosk include replacing existing composition roofing shingles with standing seam metal <br /> roofing. The color of the roofing material will be "terra cotta"with the trim and fascia <br /> "white core," and the siding will be a "lush sage" color with the exposed concrete a <br /> dark grey color called"cyberspace." The exterior colors of the building will be <br /> changed to match the colors selected for the new roof, trim and fascia, and siding. <br /> Applicant: Peter J. Piper <br /> Landowner: D & L Fujimoto LLC <br /> TMK: (3) 7-5-007:033 <br /> Location: 75-5722 Hanama Place, Kailua-Kona, HI 96740 <br /> The Commission took up this item at 5:19 p.m. <br /> Ms. Newlon gave a PowerPoint presentation on proposed exterior improvements to the existing <br /> Kona Center commercial building and the kiosk structure in its parking lot. She said that the <br /> commercial building had originally been Foodland and retailers, built in 1978, and that the kiosk <br /> had been built as a coffee stand in 2004. She displayed a map, site plans, and photographs and <br /> described the location and current appearance of the property. She also described the proposed <br /> improvements by going over the applicant's plan drawings. She noted that the proposed <br /> materials and colors were consistent with the guidelines of the Master Plan for Kailua-Kona. <br /> She also noted that there was currently an outdoor seating area with umbrellas by the kiosk as <br /> shown in the photographs, which was not included in this application but did require review by <br /> the Commission. She said that the applicant/owner would be required by the Planning <br /> Department to add the seating area to their Plan Approval site plan; therefore, the Commission <br /> might consider accepting it as part of this design review application and include in the action the <br /> Commission would take. She commented that outdoor seating was also consistent with the <br /> Master Plan for Kailua-Kona. <br /> In response to Commissioner Smith's questions, Ms. Newlon clarified that the zoning of the <br /> property was correctly noted in the applicant's submittal as "V"which stands for Resort-Hotel, <br /> that the application before the Commission at this time was to replace the roofing and change the <br /> exterior paint color, and that it was her suggestion that the Commission consider the outdoor <br /> seating area as part of this application since photographs of it were included, otherwise the <br /> applicant would have to come back for that portion. Chairman Roth opined that although the <br /> Commissioners might be able to state their opinion on the seating area, it was not something that <br /> the Commission could take action on since there was no such request on paper. <br /> Commissioner Crusat inquired about the business signs in the photographs. Ms. Bugado <br /> responded that Ms. Newlon's research had not found permits for some of the existing signs, and <br /> that no sign permit was part of the Commission's review at this meeting. Commissioner Crusat <br /> further asked if the applicant would replace the roof and paint the exterior walls and yet keep <br /> those existing signs. Chairman Roth stated that the applicant/owner would have to address the <br /> sign matter separately. <br /> Chairman Roth called upon the applicant. Mr. Piper stated that he would like to defer the <br /> outdoor seating and signage review to a later date and get the roof replacement approved because <br /> 2 <br /> Kailua Village Design Commission <br /> March 22,2022,Meeting Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.