My WebLink
|
Help
|
About
|
Sign Out
Home
PD BACKGROUND REPORT (PL-SPP-2022-000012)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2022
>
2022-06-02 Windward
>
Item #2 Yamada and Sons, Inc. (PL-SPP-2022-000012)
>
PD BACKGROUND REPORT (PL-SPP-2022-000012)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 3:02:54 PM
Creation date
5/25/2022 2:57:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f , <br /> «� 0, <br /> County Skeet Range <br /> s <br /> Irn <br /> r ti. <br /> W <br /> y <br /> "' f S"7" Ite <br /> ° ggk► Mo <br /> - <br /> , <br /> Stockpile Area <br /> Scrape and Fill .� <br /> EXISTING " `r r r r r` % <br /> YAMADA$SONS <br /> ,11,yy .x At , <br /> 1 <br /> W <br /> QUARRY , r <br /> 14.99 ACRES <br /> r <br /> Figure 3—Aerial Site Plan �Y <br /> 2. Proposed Project Operational Details <br /> a. Overall Scope: Approximately 25,000 tons of"raw" rock material will be excavated <br /> from the Project Site on a monthly basis, with the excavation reaching a maximum <br /> depth of approximately 80 feet from its existing grade. As rock material is <br /> excavated, the perimeter of the Project Site will have engineered fill with a 3:1 slope <br /> to avoid a sheer drop and facilitate future use should a suitable use be <br /> contemplated. A vegetative buffer will also be provided around the perimeter of the <br /> Project Site. The amount of rock resource within the Project Site is estimated to <br /> provide an active quarry lifetime of approximately 20 to 30 years. <br /> b. Equipment: Excavation of rock will be accomplished through the use of heavy <br /> equipment when possible. If impenetrable rock is encountered during excavation <br /> activities, drilling and blasting will be performed. <br /> c. Material Transport: Extricated "raw" rock material will be temporarily stockpiled <br /> within the Project Site or immediately removed to Applicant's baseyard facilities <br /> located along nearby Railroad Avenue for crushing and processing into finish <br /> 3 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.