My WebLink
|
Help
|
About
|
Sign Out
Home
2006-02-03 TCellco
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2006
>
2006-02-03 TCellco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 10:33:24 AM
Creation date
6/13/2011 10:32:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
YOUNG:We then, after receiving Mr. Elys letter, we then had our engineersgo out <br />to the property and do some calculations based on both an 80-footanda 100-foot tower. The <br />results came back, which were submitted to Mr. Love. The results came back such that it is too <br />far to the Pahoa side to be able to provide coverage all the way back to Keaau, such that if we <br />were to put a tower in that general Ainaloa community area that a second tower would still be <br />needed between Orchidland towards Keaau. So rather than looking at just one antennae tower at <br />Orchidland, wed be looking at one at Ainaloa and finding another site close towards Keaau. <br />Again, studies were prepared and documents were sent with some maps showing the coverage <br />pattern for site at Ainaloa versus without a site there. <br />SIRACUSA:Thank you. And Id like to ask Mr. Ely if he has anything to add to that, <br />to elaborate on? <br />ALAMEDA:Pleasedo.Youmaybeabletoaskthat,exceptthosewhoareanswering <br />please answer the question and not go into a testimony or go tangential. Commissioner <br />Siracusa? Go ahead. <br />ELY:Yes, I would like to address -. <br />ALAMEDA:Please speak into the mike, in the mike please. <br />ELY:Oh, sorry. Yes, I would like to address that. Verizon did, after the <br />Planning Commission hearing, the contested case hearing in late November, go out to the site <br />and made their first radio propagation measurements and determined that it was not acceptable. <br />We questioned whether or not they had actually made these measurements based on a higher <br />tower because their claim conflicts directly with the report of their engineer, engineering <br />department. And I quote from a letter from a Debra Adams, their engineer, Hopefully they will <br />answer your question regarding whether or not Verizon Wireless can co-locate on a T-Mobiles <br />existing tower. The implication of this is clearly that they didnt look at putting in a new tower, <br />they looked at co-locating on the shorter T-Mobile tower. <br />ALAMEDA:Thank you for answering the question directly. I appreciate that. Also, <br />fellow Commissioners, if you find that the question is not being answered directly, please just <br />jump in and ask that the question be directly answered. Commissioner Graham. <br />GRAHAM:I had a question for Mr. Torigoe. A substantial part of the discussion at <br />the contested case hearing as we read the minutes and all really was about alternatives. But, you <br />know, were being asked to grant a special permit; and when I look at our rules and I look at the <br />law, I dont see any part of it that says, you know, if theres no better alternative you should <br />grant it or anything like that. So Id like it if he could give us a legal direction of how we should <br />view this whole issue of alternatives. <br />ALAMEDA:Thank you, Commissioner Graham. Mr. Torigoe? <br />TORIGOE:Yes, thank you. Ultimately I think we should probably ask the parties, <br />you know, for input on that as well. But just very generally, I think, in the past in various special <br />7EXHIBIT B <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.