My WebLink
|
Help
|
About
|
Sign Out
Home
Record for Bolton, Inc. (SPP-16-000188)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2022
>
2022-06-16 Leeward (CANCELLED DUE TO LACK OF QUORUM)
>
Item #2 Bolton, Inc. (REMAND SPP-16-000188)
>
Record for Bolton, Inc. (SPP-16-000188)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 2:13:28 PM
Creation date
6/2/2022 1:58:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
If no, stop. Project needs EA or EIS. 'Write applicant, explain. Reject <br /> application. If PPM, process but send applicant a letter explaining they must <br /> do EA and that no TA until this is done. <br /> If yes, go to#5. <br /> 5. Contact the agency whose exempt list it falls under. Let them know that <br /> we are considering exempting the project per the category. Ask for any <br /> objection. <br /> If no objection, go to A. If there is objection, see planning director. <br /> 6. Is the project in an unusually sensitive area, or are there successive <br /> actions planned that may have a cumulative effect? If yes or if in doubt, see <br /> planning director. If no, go to#'I. <br /> 7. Write brief letter to agency whose exempt list it falls under mentioning <br /> that we consulted with the agency and have determined this project is <br /> exempt from EA requirements under exempt list item . CC applicant. <br /> Process is now finished. <br /> Checklist completed by ', Date: �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.