My WebLink
|
Help
|
About
|
Sign Out
Home
2022-05-05 Windward Exh C (Item 3 County Council Initiated PL-CCI-2022-001)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2022
>
2022-05-05 Windward Exh C (Item 3 County Council Initiated PL-CCI-2022-001)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 2:19:29 PM
Creation date
6/2/2022 2:19:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
schedule. The correct reference should be 291-72. The close quote after the word"statutes" at <br /> the end of the sentence is likely a typo. <br /> So, in this case, if you look at the document that Councilmember Kimball sent under her Section <br /> II.B of that document, she proposed amendments to address this recommendation to make the <br /> changes that the Director is recommending. So, the Director agrees with the proposed <br /> amendment and recommends that the Commission adopt this change. <br /> Under Director's recommendation 93 Section 3. Definitions. Consider changing the term <br /> "Networked charger"to match what's in the body of the bill. The reason for this is the term <br /> specifically as presented and that's "Networked charger" is not used anywhere in the body of the <br /> bill. The word"Networked" is used four(4)times and the term, "Network-capable" is used in <br /> the definition of"Direct current fast charger". So,the Director suggested to consider expanding <br /> the term "Networked charger"to include those alternative references. <br /> However, in Section 11. C of Councilmember Kimball's proposed amendments she addresses this <br /> recommendation by shortening the term to the word"Networked" and that would kind of <br /> similarly solve that situation. The Director agrees with this proposed amendment and <br /> recommends the Commission adopt this change. <br /> Recommendation 94 under Section 25-4-54.1(a). Again, in the Zoning Code that the bill should <br /> clarify the size or type of parking spaces required to be considered a dedicated electric vehicle <br /> parking space under the requirements of the bill. The reason for that is the Zoning Code allows <br /> for different types of parking stalls for compliance with our parking requirements for example <br /> there's a possibility of compact parking stalls which will likely not work for an EV charging <br /> station. So, Director recommended that the County Council consider adding the qualifier, full <br /> size or provide specific minimum dimensions required for a dedicated electric vehicle stall. <br /> In her proposed amendments in Section I.A. It was addressed by recommending adding the <br /> qualifier"standard size" for the type of required parking space. The Director agrees with this <br /> proposed amendment and recommends adopting this change to send up to the County Council. <br /> Furthermore, the Director recommends the "standard size" qualifier be added to Councilmember <br /> Kimball's proposed amendment under Section I.B. which we'll talk about next. <br /> So, under Section 25-4-54.1(a). The Director recommends that the bill should clarify that the <br /> number of electric vehicles designating parking stalls shall correspond to the maximum number <br /> of plugs required under the development schedule that's laid out in that section of the bill. The <br /> reason for this is the section is unclear as it is currently written that each required plug needs to <br /> correspond with the number of dedicated parking stalls. For example, after 2029 each increment <br /> of 50 parking stalls shall include eight(8) electric vehicle designated parking stalls because <br /> that's the same number of plugs that will be required at that time. <br /> In Section 1. A. of Councilmember Kimball's proposed amendments she addresses this <br /> recommendation by adding language indicating that the required number of electric vehicle stalls <br /> 5 <br /> EXHIBIT C <br />
The URL can be used to link to this page
Your browser does not support the video tag.