My WebLink
|
Help
|
About
|
Sign Out
Home
05-31-2022 Agency Comments from State Dept. of Hawaiian Home Lands (DHHL)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2022
>
2022-07-07 Windward
>
Item #4 Yamada & Sons, Inc. (PL-SPP-2022-000012)
>
05-31-2022 Agency Comments from State Dept. of Hawaiian Home Lands (DHHL)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2022 1:16:43 PM
Creation date
6/24/2022 8:00:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DHHL Testimony <br /> Windward Planning Commission June 2, 2022 Meeting <br /> Agenda Item #2 PL-SPP-2022-000012 <br /> Page. 2 <br /> beneficiaries. The Exit Plan shall include mitigation efforts to leave '5ina in non- <br /> hazardous condition. <br /> Condition #2: This Condition shall be included in the Special Use Permit. <br /> Applicant shall confine all activity and access to the licensed area within normal quarry <br /> operation hours, Monday thru Friday, 7:00arn to 3:30 prn only. No activities shall be <br /> permitted during weekend hours. <br /> Condition #3: This Condition shall be included in the Special Use Permit. <br /> Quarrying shall occur on the eastern most portions of the licensed area only. This area <br /> is located the farthest away from the HHCA Pana'ewa residents. <br /> Condition #4: This Condition shall be included in the Special Use Permit. Clarification <br /> language is required for "Transport Between Quarry and Baseyard" so that it is <br /> aligned/consistent with the permit application. This conditions requires specific and <br /> unambiguous language regrading rock hauling. This condition shall include no transport <br /> on Railroad Avenue that borders and/or is adjacent to HHCA communities. <br /> Condition #5: This Condition shall be included in the Special Use Permit. Within two <br /> months of permit approval, the applicant shall prepare a water source plan for dust <br /> suppression and the plan shall be shared with KPA and DHHL. <br /> Condition #6: This Condition shall be included in the Special Use Permit. The <br /> Application states that the County of Hawaii General Plan classifies the project site as <br /> "Important Agricultural Lands." The permit shall state that the project site is on <br /> "Important Agricultural Lands." In addition, the permit must include legend/key for <br /> Figures 4, 5, and 6; State Land Use, Zoning and LUPAG. <br /> Condition #7: This Condition shall be included in the Special Use Permit. The permit <br /> shall describe the adjacent affected RCCA community of Pana'ewa with data and a map <br /> identifying number of residences and population of Ag and residential lots and include <br /> detail regarding distance between the project site and adjacent DHHL lands <br /> Condition #8: This Condition shall be included in the Special Use Permit. The permit <br /> shall include an acknowledgment that environmental injustices due to industrial and <br /> commercial development have impacted the surrounding HHCA communities adjacent <br /> and near the project area. <br /> Condition #9: This Condition shall be included in the Special Use Permit. The permit <br /> shall include dates of public participation and which adjacent property owners were sent <br /> permit application notices. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.