Laserfiche WebLink
HAYASHI:Okay, that would be Condition 7 and we€re amending the area that is <br />underscored and it will read, A drainage study shall be prepared prior to the issuance of any <br />construction permit and the recommended drainage system shall be constructed meeting with the <br />approval of the DepartmentofPublic Works prior to final subdivision construction approval or <br />dwelling occupancy‚. So weadded the word construction after subdivision, between subdivision <br />and approval. So basically you can grant the final subdivision approval, bond improvement but <br />before we issue final construction approval that the drainage system has to be installed. <br />YUEN:Yeah, when you say final construction approval you mean that the <br />improvements, that the improvements have been inspected. Built and inspected. That€s what I€m- <br />HAYASHI:Inspected as approved by Department of Public Works. <br />YUEN:Right,Ki€s,whatdowecallthat? <br />EMLER:Finalsubdivisionconstructionapproval. <br />YUEN:Thatistherightlanguage?Okay. <br />EMLER:That€swhatIwoulduse. <br />YUEN:Okay thank you. <br />HAYASHI:Yeah I got the words from Ki. <br />GRAHAM:Do we have any more from the applicant? <br />LAU:No that€s it. Nothing more Mr. Chairman. <br />GRAHAM:Okay and Mr. Smith you have no particular testimony at this moment? <br />SMITH:No. I€d like to say, the last time I was here in front of the council it was <br />about 7 years ago and Chris and I were on the opposite ends of the table, I was stopping his <br />development because I wanted to park in Keauhou area. So it€s kind of ironic that 7 years later <br />we€re here together. But, I bought this property and brought Chris in as my partner. This is, I <br />own the 6 acres behind and the 5 acres on the one side and it€s a family. This is my family that <br />lives there, my son and my daughter and myself. So, I bought the property to protect our family <br />and I want something nice there that works in the area cause I€ve lived here. You know I was <br />here when they only had one stop light and a lot has changed since then and I know there€s a lot <br />of problems with traffic and development and I feel for you guys cause I know where you€re <br />going through with all of this cause it takes me an hour now to get from Keauhou to the airport <br />where it used to take a few minutes so. I€m concerned as much as you guys are in development. <br />I don€t feel that this, this small project has a, has a major impact in the area so that€s why I€m <br />going through with it this way. And we€ve cut down the, you know it was zoned for 31-units <br />EXHIBIT <br />5 <br /> <br />