My WebLink
|
Help
|
About
|
Sign Out
Home
2006-02-24 TKona_REZ05026
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2006
>
2006-02-24 TKona_REZ05026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 11:37:40 AM
Creation date
6/13/2011 11:37:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CARR:Ric is saying that theres an area thats 17%. <br />YUEN:Not low down though? Low down-? <br />CARR:Low down were okay its the upper portion. <br />YUEN:Yeah so its as I said the sidewalk portion is only in the RM. <br />CARR:Correct. But again coming back to the-. As far, it was our intent to do a <br />much more rural community with Ag standards 1-acre plus lots on the average. If it is the policy <br />or the amendment now to ask us to say that all of the roadways be dedicable to the extent of <br />meeting all our County standards. You know what my concern is, the impact on the cost and do <br />I want to come in for more units in order to pro rate that cost. You know thats the issue. It <br />alwayscomesbacktookaywhatstheeconomicimpactontheseadditionalimprovementsinthe <br />community. See were trying to keep the cost down in order-. You know one perspective will <br />say to go make more money and the other perspective is to mitigate costs for what were doing in <br />public improvements and public benefits as well. <br />GRAHAM:Can we leave this for now and get public testimony and then when you <br />come back again after public testimony and then Mr. Yuen will have more time to think about it <br />by then? Thank you all very much. <br />EMLER:Commissioner Graham? <br />GRAHAM:Yes. <br />EMLER:While Im up here may I bring a couple of things to your attention? I was <br />going to ask that Condition L have a slight revision. The second sentence, Im sorry third <br />sentence. During, this is the same as the last application, yeah the last application Royal Alii we <br />had this change made. Drainage improvements shall be constructed meeting with the approval of <br />the Department of Public Works prior to the issuance of final subdivision construction approval <br />or. So final subdivision construction approval or is the added amendment and then continue as <br />is. <br />GRAHAM:All right thank you. <br />EMLER:There was one other thing Id like to point out and that is in the <br />application, Figure 10 showing the flood map it depicts what theyre saying is the current flood <br />insurance rate map. That is not how the current flood insurance rate map would look if you <br />included the revisions that had been made using map revision, letters of map revisions over the <br />past few years for Malulani Gardens and the Lowes project. So that map is shown in Figure 10 I <br />think its on page 39, is not, would not be the current map. And as stated in the narrative which <br />is I think on page 37 it does reflect the correct status of the project in that a portion of it does lie <br />within zone A. And its just the map does not. <br />EXHIBIT E <br />19 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.