My WebLink
|
Help
|
About
|
Sign Out
Home
2006-02-24 TKona_REZ05026
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2006
>
2006-02-24 TKona_REZ05026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 11:37:40 AM
Creation date
6/13/2011 11:37:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WHEELOCK:Hale Kapili Street and Malulani and Malulani. <br />WATANABE:Yeah, could you respond to that I mean I had, I know theres some <br />separation there already but I think they were looking at whether the length of those turn lanes <br />were sufficient given the added density. <br />WHEELOCK:Thank you Commissioner Watanabe. <br />GRAHAM:Mr. Wheelock go ahead. <br />WHEELOCK:Im sorry. After we got that response we did request our traffic consultant <br />M & E Engineering to make an addendum and study those 2 intersections. Id like to introduce <br />Warren Yamamoto our traffic engineer who did complete that study. Thank you. <br />GRAHAM:Mr.Yamamotocouldyougiveyournameandyouraddressbeforeyou <br />testify so we have it on the record please? <br />YAMAMOTO:Okay. <br />GRAHAM:Thank you. <br />YAMAMOTO:My name is WarrenYamamoto at M & E Pacific Inc. 833 Bishop Street, <br />Honolulu, Hawaii. And per Mr. Wheelocks request we did prepare an addendum to identify the <br />traffic impacts at the 2 internal unsignalized intersections along Malulani Drive and did the <br />County receive it Mr. Emler? Okay. And we found that due to the low volume of traffic on the <br />road that there would not be any adverse traffic impact. The, a concern was the length of cues <br />along Malulani Drive from Queen Kaahumanu backing up and possibly blocking the access from <br />Malulani Gardens and during the p.m. peak hour our forecast estimates are that the cue lengths <br />would be about 6 vehicles. And we have storage for 7 to 9 vehicles there so, thats 90% cue <br />length will be at 6 vehicles so, there should be sufficient room for the vehicles from Malulani <br />Gardens Subdivision to get onto Malulani Drive. <br />GRAHAM:Thank you Mr. Yamamoto. Is that clear? <br />WATANABE:Thank you. <br />GRAHAM:Sure. Mr. Yuen. <br />YUEN:We got a letter from Mark Norman dated, I guess we just got it its <br />February 20, 2006 talking about a Kealakawila Road. Did you get to look at that letter? <br />WHEELOCK:No we didnt. But I did speak with Mark Norman earlier. He was here <br />with his mother and we went over the issues. He owns the property immediately east or mauka <br />of the mauka end of our project. <br />EXHIBIT E <br />9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.