My WebLink
|
Help
|
About
|
Sign Out
Home
07-08-2022 Letter from Petitioner's Attorney
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2022
>
2022-07-21 Leeward
>
Item #2 Bolton, Inc. (REMAND SPP-16-000188)
>
07-08-2022 Letter from Petitioner's Attorney
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 2:18:22 PM
Creation date
7/15/2022 2:17:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Daniel B. Bolton <br /> Janet T. Bolton <br /> June 3, 2022 <br /> Page 2 <br /> Channel CLOMR Case No. 09-09-0036R/NPDES File HI R10 D565; owner shall comply with <br /> Hawaii County Code Sect. 27-16(f)(3)(13) or successor statue and condition 9 of SPP 99-015. <br /> This permit was last renewed on October 15, 2021with an October 17, 2022 expiration date. <br /> Stockpiling Permit No. 092525 was issued by DPW—Engineering Division for TMK 7-5-017:031 <br /> on January 22, 2016. This permit allowed for the stockpiling of up to 8,000 cubic yards of <br /> material. The permit stated that it was for"stockpiling in conjunction with Kona Coffee and Tea <br /> Co. Flood Channel Project." The permit was not renewed. <br /> Stockpiling Permit No. 092715 was issued by DPW—Engineering Division for TMK 7-5-017:044 <br /> on June 2, 2017. This permit allowed for the stockpiling of up to 14,800 cubic yards of material <br /> referencing "Grading Permit No. 092524." This permit was last renewed on June 2, 2021with a <br /> June 3, 2022 expiration date. <br /> Stockpiling Permit No. 092749 was issued by DPW—Engineering Division for TMK 7-5-017:031 <br /> on September 8, 2017. This permit allowed for the stockpiling of up to 14,000 cubic yards of <br /> material. The permit stated that"grading for the flood channel will generate substantial volumes <br /> of excavated material that will be stored on site while the material is broken down for beneficial <br /> use in the construction of floodway." This permit was last renewed on December 13, 2021with a <br /> December 14, 2022 expiration date. <br /> A letter prepared on behalf of Bolton Inc. to the County of Hawaii Planning Department, from <br /> Kona Wai Engineering, LLC, dated July 26, 2017, and signed by Stephen J. Hebert, P.E., stated <br /> that"the estimated time to complete the floodway work (i.e., the Kona Coffee and Tea Company <br /> Flood Channel Project) is eighteen months." No other information regarding project completion <br /> or a requested time extension has been received by DPW. <br /> FINDINGS <br /> The Grading Permit was issued on the basis that the applicant was completing a "Flood <br /> Channel Project" per the CLOMR granted by FEMA for Case No. 09-09-0036R. More than six <br /> years have passed since the initial issuance of Grading Permit No. 092524. Numerous <br /> inspections of the site have been performed and results have been shared with the <br /> Permittee/Site Owner. In addition, DPW has been provided with reports and documentation <br /> from concerned parties indicating impacts to surface waters that have occurred due to soil <br /> erosion and sediment runoff from the site during extreme rainfall events. The Permittee has <br /> been advised by inspectors and in writing to do more to mitigate the contribution of the site to <br /> surface water impact. A letter issued by DPW on May 31, 2017, in fact directed the Permittee <br /> "to give high priority to quality control and minimizing disturbed areas." <br /> The Permittee last submitted a schedule indicating the project would be completed within <br /> 18 months of their July 26, 2017, letter. Based on site observations on March 15, 2022, the <br /> current project completion date is unclear, and it appears that the Permittee/Owner has no <br /> timetable to complete the work scope for the CLOMR. It should be noted that for every day the <br /> work remains incomplete, and the bare ground is exposed and not re-vegetated, and <br /> insufficient stormwater retention and/or detention is provided, and proper erosion control <br /> County of Hawaii is an Equal Opportuniry Provider and Employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.