My WebLink
|
Help
|
About
|
Sign Out
Home
07-18-2022 Applicant Response to Public Testimonies (PL-REZ-2021-012)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2022
>
2022-07-21 Leeward
>
Item #1 Siting Chen (PL-REZ-2021-000012)
>
07-18-2022 Applicant Response to Public Testimonies (PL-REZ-2021-012)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 2:48:29 PM
Creation date
7/20/2022 2:48:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
expansion and of limited agricultural potential. If approved this project would generate <br /> housing and farming opportunities conforming to the surrounding area in a time of housing <br /> crisis. <br /> 4. Regarding cul-de-sac. Please see response to question #10 above. <br /> Mr. Van Pernis' comments: <br /> Firstly, The Hagen-Cowell Trust applications also before the Commission do not take <br /> access from Hualalai Road as Mr. Van Pernis contends. That proposed project would take <br /> access from Mamalahoa Highway near its intersection with Ali'i Drive and Napoopoo <br /> Road, approximately 10 miles from the subject property and Hualalai Road. Traffic <br /> studies were conducted in 2013 by Witcher Engineering, LLP for the previously <br /> proposed RS-15 development of approximately 43 lots. We are nearing the 10-year mark <br /> of the Witcher Engineering Study (2013), well scope of the study. As summarized in the <br /> Planning Recommendation Report for that application and part of the public record: <br /> The report concluded that the short term impact of construction would not have a <br /> significant effect along Hualalai Road. The TIAR also concluded that the long term effect <br /> of this project on the Queen Ka'ahumanu Highway/Hualalai Road intersection is <br /> minimal. The TIAR concluded that the levels ofservice at the intersection ofPuapuaanui <br /> Street and the Queen Ka'ahumanu Highway, as well as Hualalai Road and the project <br /> entrance to be "A"or `B"during the AM and PMpeak hours and are thus acceptable <br /> levels ofservice in compliance with concurrency requirements ofthe Hawai'i County <br /> Code. <br /> Mr. Nunberg's comments: <br /> Please see response #4 to Ms. Dunn's comments relating to agricultural use requirements. <br /> We would also like to note that we have discussed this project on multiple occasions over the last <br /> year with Mr. David Sveiven, owner of the neighboring parcel to the north and he has no <br /> concerns about the project and says that he gives it a"thumbs up." <br />
The URL can be used to link to this page
Your browser does not support the video tag.