My WebLink
|
Help
|
About
|
Sign Out
Home
2005-03-18 TWDC
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2005
>
2005-03-18 TWDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 12:09:17 PM
Creation date
6/13/2011 12:09:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Applicant in this case, WDC Properties, LLC, is requesting an extension of their life of their <br />permit for 10 additional years, until June of 2015. The Applicants have come in for several time <br />extensions or requests to extend the life of their permit and have been granted five years for <br />several amendments. This request is for a 10-year period. <br />There is one change Id like to make to the Recommendation, and this is located on Page 5, just a <br />minor change. In the paragraph that begins with Based, thats located on the upper portion of <br />the Recommendation, it says, second line for an additional five (5) years, if we could change <br />five (5) to ten (10) years until June 30, 2015. <br />The Planning Department has not received any letters of opposition or support for this <br />application. The Planning Director is recommending approval of the 10-year additional life to <br />the Special Management, correction, the Special Permit, for Condition No. 4. Any questions? <br />GALDONES:Commissioners, any question of Jeff? Commissioner Alameda? <br />ALAMEDA:Jeff, Im just wondering if you add all the extension requests what would <br />wecomeupto,withthe,andwiththe10? <br />DARROW:Well,thepreviouspermit,correction,thepermitwasapprovedin1983-. <br />ALAMEDA:Right. <br />DARROW:And, so, up to this point were talking a period of over 20 years. The <br />actual extensions, we have our first extension in 1990 for 5 years, we have an additional one in <br />1995 and now we have one for a 10-year request. So that would be a 20-year time that we are <br />extending the life of this permit. But, again, that was 7 years prior to that as well. <br />ALAMEDA:Okay. <br />GALDONES:Thank you, Jeff. Commissioner Fujikawa? <br />FUJIKAWA:In the year 2000, 2001 or 2000, wasnt there an extension at that time? <br />DARROW:Correct, 5-year time extension. <br />FUJIKAWA:It was a 5-year, so already, what, 5 years. Thank you. <br />GALDONES:Jeff, during this period of, so it was 22 years now. Were there any <br />complaints about their operation from the public or the neighboring properties? <br />DARROW:I believe there were some correspondences that were submitted at the <br />times of the requests, but the requests were approved. As far as our records show, we dont have <br />anything from the public regarding this. <br />GALDONES:Thank you. Seeing no further discussions or any questions from the <br />Commissioners to the Applicant -. <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.