My WebLink
|
Help
|
About
|
Sign Out
Home
2005-03-18 TWAIKOLOA
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2005
>
2005-03-18 TWAIKOLOA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 12:10:50 PM
Creation date
6/13/2011 12:10:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EMLER:I dont believe we have a more current traffic study. I didnt come, <br />I didnt find one, anyway, when I reviewed the application. I did make a comment to the <br />application that the traffic study should be updated and monitored periodically to <br />determine when the intersection should be signalized, based on warrants of the MUTCD. <br />SPRINGER:Mr. Chairman? <br />GALDONES:Commissioner Springer? <br />SPRINGER:Should that then be reflected in Condition C or somewhere else in <br />the conditions of this? <br />EMLER:Well, that was my recommendation. Its up to the Planning <br />Director to impose the condition. <br />SPRINGER:Mr. Chair? <br />GALDONES:Commissioner Springer. <br />SPRINGER:Could the Director respond to that question that I have about the <br />currencyofthe1989trafficreportandifthereshouldbeamorecurrentanalysisdone. <br />GALDONES:Mr. Yuen? <br />YUEN:I think thats a good suggestion. <br />GALDONES:Mr. Emler, if were requesting a more updated one, how long does <br />that take to acquire something like that? Where Im going with this is if were going to <br />make that as part of the condition, shall we make it part of the condition that they do get <br />that now before we approve it? But I dont know how long its going to take before they <br />can get something like that. Im looking at how its going to impact their application. <br />YUEN:It should be, the timing should be before Final Subdivision <br />Approval because we dont know, theres no sense doing it now if they dont build now. <br />The time to do is, say they build in 2009, they go to subdivision in 2009, thats when we <br />will see that, thats when we will see it done. <br />GALDONES:Thank you, Mr. Yuen. Mr. Emler? <br />EMLER:Based on my reading of the ordinances, it would seem that it <br />separates when the warrants are needed. It actually separates when the warrants are <br />needed from the construction of the subdivision. <br />GALDONES:Okay, thank you. Commissioner Springer? <br />4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.