Laserfiche WebLink
ARAI:Okay. Thank you, Mr. Chairman. Good morning, Commissioners. <br />If I may direct your attention to our location map, the project site is located on the upper <br />or the Old Mmalahoa Highway, which is indicated by this white line here, and heading <br />south from its intersection with Palani Road. This is, where I'm pointing is Palani Road <br />Junction, and this is Palani Road itself leading down toward Kailua-Kona. The project <br />site is indicated -, is currently designated Ag-20, as indicated by this olive green color <br />here. And the project site is bounded by these homestead roads, which is indicated here <br />in white. Surrounding lands are designated Agricultural-1 acre minimum lot size, as <br />indicated by this lighter green color, as well as Ag-5 in this even lighter green color. <br />IÓd direct your attention to the site plan itself. Again, the homestead roads that I made <br />mention to as indicated here in white is reflected here on this more detailed site plan in <br />this same location, bordering this project site on three different sides. The homestead <br />roads, access to the project site will be provided by these homestead roads, which have a <br />right-of-way of roughly 20 feet with 10-foot wide paved surfaces. <br />The project site itself is about 21.7 acres in size. The applicant's request is to allow for <br />the subdivision of this lot into two lots, one lot being 3 acres in size, the other balance <br />being about 18.7 acres in size. The current Ag-20 zoning would not allow the <br />subdivision of the property. Therefore, that is why the applicant's request is two-phased, <br />meaning from a current zoning designation of Ag-20 into a designation of Ag-10 for the <br />balance of the property, about 18.7 acres, as well as a request to Ag-3 to allow the <br />applicant to basically carve out a 3-acre portion of the project site. The 3-acre, proposed <br />3-acre lot is indicated here in the northeastern corner, as outlined in yellow. <br />The Director has reviewed the request and find that the applicant's request is consistent <br />with the General Plan as well as the guidelines for granting of a change of zone. <br />Therefore, he is offering a favorable recommendation of this change of zone request <br />subject to conditions of approval. <br />Some of, one of those conditions of approval, and I would like just to emphasize that if <br />you look at your recommendation report, in the back, it will, Condition E, as in Edward, <br />will require that a 15-foot wide road widening easement be estab <br />where the property does abut the homestead road. That is in anticipation that in the <br />future should this area be further developed, that the roadways can be widened to <br />accommodate additional traffic. But given the applicant's limited proposal, which is just <br />the creation of one additional lot, the Department is not requiring any roadway <br />improvements at this time. <br />Further, there was a comment from the Department of Water Supply regarding the <br />availability of, not so much the availability of water but the type of system improvements <br />that would be necessary to support a proposed subdivision. I would like to quickly <br />mention that the property is currently, the applicant currently has secured two water <br />services to support the property, and that is to support two dwellings on this 21-acre <br />project site. In Water Supply's comments, the act of subdivision would require them to <br />basically upgrade the water system with 100,000 gallon reservoir, much larger mains than <br />2 <br /> <br />