My WebLink
|
Help
|
About
|
Sign Out
Home
2006-04-07 TAinaloa
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2006
>
2006-04-07 TAinaloa
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 12:41:35 PM
Creation date
6/13/2011 12:41:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALAMEDA:Ms. Todd? <br />LEITHEAD-TODD: I think you may want to ask Mr. Torigoe but the Court has more <br />authority than just sending it back to you on a remand. <br />GRAHAM:Okay. Thank you. <br />ALAMEDA:Commissioner Siracusa. <br />SIRACUSA:You know, Ainaloa Boulevard definitely needs work and it needs <br />ongoing maintenance, too; and yet the additional $1 million, my feeling was, was <br />probably not enough to do the job. And, now, were looking at chopping it in half and <br />yet the road has gotten worse in the interim and the prices for doing, the cost for doing <br />the road maintenance and repairs have gone up. How would you balance those factors <br />out? <br />LEITHEAD-TODD:Well,Ithinkthebalancingherewasthat,one,theCountynow <br />owns the road, its no longer owned by the community association. And, two, we <br />balance this in terms of trying to, if there is actually going to be a payment that we would <br />get the money sooner because then we could put it, the County appropriated, I cant <br />remember whether it was $3 or $4 million towards improvements, that this would then <br />add to that pot and we could do the improvements sooner. Ongoing maintenance would <br />be a County obligation, you know; and the County kind of, by taking on the road took on <br />that obligation. <br />ALAMEDA:Okay. Follow-up then, Commissioner McCall? <br />MCCALL:None. <br />ALAMEDA:Then Ill bring it back to this side. Follow-up, Commissioner <br />Siracusa? <br />SIRACUSA:Yeah. Im looking at this and Im saying, okay, they dont have to <br />make the improvements to where Ainaloa Boulevard comes out to the highway cause the <br />State has done that already, so theyve saved a lot of money there. Now, theyre, you <br />know, the County is going to take over the road and the maintenance, so theyre saving <br />money there by asking for the $500,000. And yet it seems that thats still not good <br />enough for them. Theyre looking to delete it, if Im correct, to delete the requirement to <br />purchase the asphalt paver and some of that other community benefit stuff. <br />LEITHEAD-TODD:No, those were deleted already. <br />SIRACUSA:Pardon me? <br />LEITHEAD-TODD:The asphalt paver was deleted already by the Planning <br />Commission. It was just the bus shelters that were still in. <br />10EXHIBIT D <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.