My WebLink
|
Help
|
About
|
Sign Out
Home
PD BACKGROUND REPORT (PL-SPP-2022-014)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2022
>
2022-09-22 Leeward (CANCELLED DUE TO LACK OF QUORUM)
>
Item #1 Gretchen I. Watson-Kabei (PL-SPP-2022-000014)
>
PD BACKGROUND REPORT (PL-SPP-2022-014)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 8:53:16 AM
Creation date
9/13/2022 8:51:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rrr- <br /> � <br /> a. T%!e l:ht Hers, ri!e4"�y �%nd t±t i l ity eat !nt <br /> owners and holders and the Developers and their successor <br /> in interest, the Rualalat Ears Community Association, <br /> will bear their pro rats share of the maintenance costs <br /> set out herein. That pro rats share will be equal to the <br /> total cost of maintenance and repair divided by the number <br /> of lots having the right to use the water system, the <br /> roadway and utility easeeeitts improvements regardless of <br /> whether or not the roadway or utility easement owner or <br /> holder or the developer or their successor in interest, <br /> the Rualalai Farms Community Association, has ever had <br /> actual usage of the roadway) provided, however, that the <br /> Developer and their successor in interest, the Bualalai <br /> Farms Community Association, shall only be responsible for <br /> a pro rat& share in the gent that they or either of them <br /> acquire or hold one or more lots in the Bualalai Farms <br /> Subdivision or any of the properties set forth in Exhibit <br /> A. In the event that any person or entity acquires more <br /> than one lot with rights to use the water systems, roadway <br /> or utility easements, his pro rats share of maintenance <br /> and repair costp, will be correspondingly increased. the <br /> maintenance cost* will include the actual costs of repairs <br /> necessary to maintain the water system, roadway and <br /> utilities ease"nts in their original condition] the costs <br /> of all taxes, assessments and charges on account of the <br /> ownership of the water system, the roadway or utilities <br /> easements and the cost of accounting, billing, and <br /> collection of amounts owing by users. Under no circan- <br /> stances will the pro rats share of the maintenance and <br /> repair costs allocable to any lot in Bualalai Farms <br /> Subdivision exceed 1!51st of the total cost of said rsin- <br /> tenance or repairs. In the event that any owner of a lot <br />
The URL can be used to link to this page
Your browser does not support the video tag.