My WebLink
|
Help
|
About
|
Sign Out
Home
2011-04-21 Leeward Exh A - Parker Ranch
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2011
>
2011-04-21 Leeward Exh A - Parker Ranch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 1:59:22 PM
Creation date
6/13/2011 1:59:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
was done is very conceptual. And so based on as, I think, Tom <br />going to be a net increase of about a little over one acre of co <br />study provided conclusions based on that minor increase of comme <br />conclusion, there are not impacts that need to be mitigated on t <br />operate at acceptable level of service according to concurrency <br />DOE has said they plan to develop the school campus around 2019 <br />weve added Condition G that basically says, okay, DOE or Parker <br />develop your school campus or your commercially zoned lands wh <br />again is in this area, commercially zoned lands are in this area <br />come in and prepare another traffic study. At that time DOE will <br />of how many students the school has to serve, so those more prec <br />traffic study. And the conclusions will be not conceptual; they <br />traffic mitigations will be very specific. So we believe that Co <br />allow either of the parties to get around doing transportation i <br />says that The applicant, successors or assigns shall provide im <br />TIAR, or by the Department of Public Works, at no cost to the Co <br />And then we have two other conditions that address area mitigati <br />construction of the Lindsey Road extension from around here down <br />previous ordinance that Parker Ranch, the previous Parker Ranch <br />Waimea Town Center area, thats Ordinance 02-25, has a condition <br />Parker Ranch goes to develop the commercially zoned lands, they <br />Road extension concurrently. So what weve done is weve added <br />so what weve done is weve added language so that this new comm <br />Parker goes to develop this area, which now is in mixed zoning, <br />would also be triggered. So any of the commercially zoned land, <br />Parker would be obligated to build the Lindsey Road extension. T <br />the property south of the divider road in this area here, so if <br />area, it also triggers the construction of the Lindsey Road exte <br />Then we also have Condition C, as was mentioned earlier. This is <br />that theres connectivity from the subdivision here over to the <br />connector road would have to be built prior to let me just see <br />school, or if for some reason DOE doesnt develop a school in th <br />its developed as residential units, then that would also trigge <br />So we feel like we have adequately, with those three conditions, <br />concurrency to ensure that when development goes in, the proper <br />GIFFIN: Thank you, Maija. Commissioners, any questions or commen <br />very much. <br />COTTLE: Youre welcome. <br />GIFFIN: It is my understanding that there is somebody here this <br />know who that person is, but I would appreciate having that pers <br />come up. Im sorry, I dont know if you were intending to testif <br />regarding -. No, of you. Okay, please come up and get onto the m <br />sorry to call you up here without -. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.