Laserfiche WebLink
as other County trash hauling trailers. So, you know, we have to <br />of private operations we allow to come in the landfill because i <br />There was mention made of the Saddle Road project. And that was <br />as a truly hypothetical kind of a worst case or best case scenar <br />of what the highest possible volume type of project would be. An <br />of that was to show that even in that kind of scenario we would <br />trucks per day approximately coming to and from the landfill, yo <br />So from the traffic standpoint, that clearly was not significant <br />agreed with that. <br />There was comment about how, why we don’t have an idea what the <br />at this point this is like the first step in the process. Before <br />out what the numbers actually would be, we want to make sure tha <br />Commission and with the Land Use Commission that this is somethi <br />And as I said, we would have to go through a number of hoops bef <br />numbers. <br />There was also mention that this is in fact a land use board. An <br />is that, you know, the function of the Commission and the LUC is <br />proposed change is an unusual and reasonable use consistent with <br />land use. And really boards such as this are not charged with ma <br />As far as the volume of overall rock, the number, the 5,000,000 <br />included are basically talked about the entire excavation. But t <br />lines of, I believe, 3,000,000 cubic yards over the life, entire <br />are actually looking at, as I stated before, is about 15,000 cub <br />little bit, when I mentioned that not being really a commerciall <br />that’s, I think that’s what we are figuring that you wouldn’t wa <br />have about 15,000 cubic yards available; you want to wait, you k <br />to have enough of a stockpile so you can actually do some commer <br />the market would be somewhat limited by distance. There was test <br />commercial sellers would like to sell wherever they can on the i <br />the County is proposing here is that we simply want to dispose o <br />as a result of operations. Obviously, when you pull out a certai <br />order to make a waste cell and you put waste in there, you are n <br />you are not going to be able to use all of the rock that you do <br />and we’ll need to dispose of, and that is all that we are lookin <br />the clientele for the rock would be limited by distance as cost <br />factor. The landfill has used about as much of the rock that it <br />point. And that’s why we have the amount that has been stockpile <br />or so. <br />There was a mention of the environmental assessment exemption. A <br />explicitly permitted under HAR, Hawai‘i Administrative Rules, fo <br />believe it’s 12-200-8 – don’t quote me on that – but there is a <br />which specifically allows agencies to declare an exemption withi <br />within HRS Chapter 343, in this case, operations of ongoing faci <br />apparently not be any more than minimal or no effects on the env <br /> <br />