My WebLink
|
Help
|
About
|
Sign Out
Home
*PD RECOMMENDATION REPORT (PL-SPP-2022-016)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-01-06 Windward
>
Item #1 Robert J. Silber (PL-SPP-2022-000016)
>
*PD RECOMMENDATION REPORT (PL-SPP-2022-016)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 3:13:12 PM
Creation date
12/14/2022 9:26:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Commission. Any substantial expansion of the facility or uses beyond what is <br />represented in these documents shall require an amendment to this permit. <br />3. Applicant shall secure and finalize all required as -built building permits for <br />existing structures used for the proposed holistic education center from the <br />Department of Public Works - Building Division within six months of the <br />effective date of this permit, including change of use building permits for existing <br />structures to be used for the proposed use. If any as -built or change of use <br />building permits are not finalized within the prescribed amount of time, the <br />holistic education center shall cease use of any unpermitted structures. <br />4. A status report shall be submitted to the Planning Department upon successful <br />finalization of all as -built and change of use building permits for existing <br />structures. No building permits shall be issued for new structures until the <br />Planning Department verifies compliance with this requirement. <br />5. Construction of any new buildings and related structures shall be completed <br />within five years from the effective date of this permit. Prior to any construction <br />(including new, as -built and converted structures), the Applicant shall secure <br />Final Plan Approval from the Planning Department in accordance with the <br />requirements of the Zoning Code. Plans shall identify all existing and proposed <br />structures, landscaping, signage, fire protection measures, driveway access and <br />parking stalls, outdoor lighting (if any), and other improvements associated with <br />the proposed development. <br />6. Applicant shall install individual wastewater system(s) within six months of the <br />effective date of this permit, meeting with the standards and requirements of the <br />State Department of Health. <br />7. The Applicant shall provide potable water from a system approved by the State <br />Department of Health to guests of the retreat facility. <br />8. The Applicant shall install, construct, and maintain improvements for Fire <br />Department Access Road (FDAR) access to the subject property and fire <br />suppression improvements on the subject property within six months of the <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.