My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda Item 1 - Aaron Spielman (PL-KVD-2022-000028)
PublicDocuments
>
Planning Department
>
Kailua Village Design Commission
>
Applications & Materials
>
2020-2024
>
2023
>
01-24 Meeting
>
Agenda Item 1 - Aaron Spielman (PL-KVD-2022-000028)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 5:35:32 PM
Creation date
1/12/2023 5:33:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o Decking at Pavilion Buildings. <br /> ■ Proposed Trex (synthetic decking) in Rocky Harbor. <br /> o Pool Fence/Barrier. <br /> ■ Decorative bamboo applied to pre-manufactured <br /> metal pool barrier system in pre-finished black <br /> powder coating 100% covered in treated natural <br /> colored bamboo, 4'-0" high. <br /> o Trash Enclosure. <br /> ■ 6'-0" high maximum enclosure with four sides and <br /> service access gates. Proposed roof. <br /> ■ Proposed Paint Color/Manufacturer: <br /> • Sherwin-Williams— Gauntlet Gray #7019. <br /> 9. Signage. <br /> a. At this time, signage and/or branding will not be included for <br /> review. When available, the signage and/or branding will be <br /> presented for review under separate cover to meet Hilton's <br /> Hampton Inn's brand standard signage. <br /> Please contact my office with any questions or comments regarding this letter, <br /> or if any additional information can be provided to support this application. <br /> Mahalo, <br /> Aaron J. Spielman,AM,NCARB,NFPA <br /> Registered Architect (AR-16214) <br /> Att. <br /> 1. Planning Department SMA Determination. <br /> 2. DPW Approved Drainage Report. <br /> 3. Real Property Tax Clearance. <br /> 4. Drawings (17 Sheets). <br /> 5. Exterior Building Material Board (M100). <br /> 6. Exterior Paint Reference West Elevation (Level 3). <br /> Cc: Owner. <br /> page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.