lines will be preserved. There are no proposed additions to Major Areas of the <br /> existing building footprints. There is one proposed relocated Exit Stair (New Stair A) <br /> at the mauka side of the exterior Hotel walkway that services the Keyrooms. This has <br /> a roof, but open-air at the sides to match existing Exit Stairs. The proposed Exit Stair <br /> is approximately 60-ft from the nearest property line at the north. <br /> There are two existing Air-Conditioning Chillers in the north-east corner of <br /> the subject parcel, originally installed by Others, that are partially encroaching the <br /> nearest northern and eastern property lines. The proposed solution is to shift the <br /> locations of the two existing Air-Conditioning Chillers, such that they are both <br /> located entirely within the subject parcel. There will be no discernible visual change <br /> to the relocated Air-Conditioning Chillers. <br /> The existing Hotel Complex contains (123) Keyrooms. There is no proposed <br /> increase to the number of Keyrooms. <br /> The existing Hotel Complex consists of single-story public area and a 2-story <br /> to 4-story Keyrooms building. There are no proposed increases to the heights of the <br /> existing buildings as measured from the existing finished grades. There is one <br /> proposed additional elevator with penthouse equipment enclosure at the roof level <br /> as required by Hilton, roughly 10-ft higher than the roof plane of the 4-story portion <br /> of the Hotel building that will occupy the original location of the Exit Stair A being <br /> relocated to accommodate the elevator. Please reference Sheet A601. This element is <br /> accessory to the primary use and does not substantially change the look of the <br /> existing structures. <br /> Project Details. <br /> 1. Site Work. <br /> a. Reposition two existing Air-Conditioning Chillers within the <br /> same general area at the north-east corner of the site,with both <br /> Chillers to be located entirely within the subject parcel. <br /> b. Reconfigure off-street parking layout, add (3) parking stalls <br /> (including an additional accessible parking space and aisle) next <br /> to the Lobby to accommodate check-ins. <br /> c. Add Trash Enclosure in parking area with roof and sanitary drain <br /> connected to Sewer as required by Hilton. <br /> d. Eliminate the existing small Pool to make space for guest lounge <br /> chairs. <br /> e. Reduce depth of existing large Pool from 7-ft to 4-ft, add a <br /> fountain, and refinish the Pool plaster and coping. Upgrade <br /> handrails,plumbing, and electrical at Pool. <br /> 2. Buildings. <br /> a. Replace existing exterior sliding glass doors at Keyrooms <br /> (private balcony side) with similar new that are code compliant. <br /> page 3 of 9 <br />