My WebLink
|
Help
|
About
|
Sign Out
Home
2005-05-12 TMOYLAN
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2005
>
2005-05-12 TMOYLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 2:33:43 PM
Creation date
6/13/2011 2:33:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SIRACUSA:Yeah. I was wondering if possibly the Condition No. 5 where it says the <br />applicant shall install an air filtration system that we could add a little proviso on to the end of <br />that. And I would like to know what the Director thinks about this, to provide it with some <br />additional protection. And that addition to the sentence would be, sufficient to insure that there <br />are no fugitive emissions. Cause you could have an air filtration system that doesnt work very <br />well or, you know, that doesnt work as thoroughly as it might. <br />GALLAGHER:It doesnt, Ill tell you. <br />SPRINGER:Mr. Director. <br />YUEN:I dont know about no emissions. I dont know if thats achievable. <br />GALLAGHER:Excuse me. <br />SPRINGER:Mr. Gallagher. <br />GALLAGHER:I wanted to bring up, I think I already said it, but he saw fumes, whenever <br />hesawsthe,Iveworkedconstructionallmylife,Iknowthattherescreosoteinthewood.And <br />it just pours, besides the fumes of the lacquer spray and all that, the creosote I see the smoke, it <br />, <br />comes on. Its a haze, a haze. It just, my cabin that I built is about right lined up with it. <br />Unfortunately I had no idea he was there; and so I like was kind of almost through, I had people <br />from my church come and help me build my place, and its like, hey, whats going over, we <br />didnt even realize what was going on at first, you know. So -. <br />SPRINGER:Thank you, Mr. Gallagher. Commissioner Siracusa, any follow up to the <br />Directors answer to your question? <br />SIRACUSA:Well, hes only objecting to the word no. Could you suggest then some <br />other wording that might make that a little bit stronger, you know, that the air filtration should <br />be -. Its one thing to install it, for example, and its another thing to use it. Its another thing <br />to use it when youre spraying. I mean, so Id like to see us maybe tighten that up a bit with <br />some wording. <br />YUEN:I dont have anything. You know, we can say use. I would consider <br />use to be included, I mean, to be understood within the condition. <br />SALAVEA:Madam Chair? <br />SPRINGER:Mr. Director? Commissioner Salavea, before I call on you, just some <br />clarification on whether its the installation and use of the air filtration system, or the hours of <br />operations, or the decibel levels, sound levels during operation of the equipment, how does <br />enforcement occur, and how would complaints of a nuisance by a neighbor be handled? <br />YUEN:If the permit is granted, some of the conditions are relatively clear cut, like <br />the hours of operation. If they operate at different times, then the neighborhood should call in a <br />complaint to us; and our investigator will look into it. Thats about as far as I can promise that. <br />14EXHIBIT B <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.