My WebLink
|
Help
|
About
|
Sign Out
Home
2005-03-04 Planning Commission Minutes
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Minutes
>
2005
>
2005-03-04 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 2:51:12 PM
Creation date
6/13/2011 2:50:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Planning Director is recommending approval of this particular request with numerous <br />conditions. And one of the conditions would be to limit the maximum number of size lots to 175 <br />as noted in the background report and recommendation that was provided to you. <br />Just as a information, the County Code states that once the Planning Commission receives the <br />application, the Planning Commission has 90 days in which to make a decision on the <br />application. If no decision is made within that period of time, then it will be going up to the <br />Planning, County Council for appropriate action. <br />So seeing that there are only five members here today, I just wanted to point that out to you that <br />you have 90 days from today in which to take action on this particular request. Are there any <br />questions at this time? <br />ALAMEDA:CommissionerSiracusa? <br />SIRACUSA:Onpage7,Inoticedthattherewas-. <br />NOMURA:Microphone-. <br />SIRACUSA:Oh,sorry.Onpage7,Inoticedthattherewasreferencetoonesingle <br />family dwelling or one farm dwelling per lot; and then theres a definition of a farm dwelling. <br />Does this mean that not all the houses that are constructed on these parcels will have to be related <br />to agricultural use? <br />HAYASHI:Well, since the property is within the State Land Use Agricultural District, <br />it would have to be a farm dwelling by definition. <br />SIRACUSA:Then why is it worded, why doesnt it just say one farm dwelling? Why is <br />it, its confusing for it to, in several places it refers to a single family dwelling as opposed to a <br />farm dwelling. <br />HAYASHI:Are you talking about -? <br />SIRACUSA:Page, page 7. <br />HAYASHI:Page 7 of the -? There are several page sevens. <br />SIRACUSA:Several page sevens. Wait a second. Background report, is that in the <br />background report? No, not that page 7. <br />HAYASHI:Well, basically, what were doing is providing you information on what <br />the agricultural project district -. <br />SIRACUSA:Okay, I found it. <br />HAYASHI:Code requirement is. <br />4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.