My WebLink
|
Help
|
About
|
Sign Out
Home
PD Background and Recommendation Amendments to Planning Commission Rule 8 and 9
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-04-20 Joint Leeward & Windward
>
Item #1 Proposed Amendments to Planning Commission Rule 8 and 9
>
PD Background and Recommendation Amendments to Planning Commission Rule 8 and 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2023 7:38:25 AM
Creation date
3/20/2023 7:37:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pursuant to chapter 91 and shall enforce the shoreline setbacks and rules <br /> pertaining thereto." <br /> Based on this amendment to HRS, Section 11-5 of Department Rule 11 is proposed to be <br /> amended as follows: <br /> "(a) The minimum shoreline setback line shall not be less than forty (40) feet inland <br /> from the shoreline." <br /> Reasons for the amendments: This provision will help shift new development away <br /> from exposure to coastal hazards. This amendment will no longer allow for Counties to <br /> reduce the shoreline setback to less than 40 feet for existing shallow shoreline lots where <br /> the buildable area of the parcel will be less than 50% of the parcel after applying the <br /> setback. <br /> 11. HRS 205A-43.5(a)(2) was amended as shown which affects Section 8-10(a)(2) through <br /> (3) of Commission Rule 8 and Section 11-11(a)(2)through (3) of Department Rule 11: <br /> "(2) Protection of a legal structure [ I i -,,,�ro than $20 000 ] or public facility, <br /> including any facility owned by a public utility that is regulated pursuant to <br /> chapter 269, that does not fix the shoreline, under an emergency authorization <br /> issued by the authority; provided that the structure or public facility is at risk of <br /> immediate damage from shoreline erosion[;] and the authorization does not <br /> exceed three years, <br /> Based on this amendment to HRS, Section Section 8-10(a)(2) of Commission Rule 8 is <br /> proposed to be amended as follows: <br /> (1) Protection of a structure determined by the Department to be legally constructed, <br /> [whieh eosts more than $20 000;] a legal structure or public facility, including any <br /> facility owned by a public utility that is regulated_ pursuant to Chapter 269,HRS that <br /> does not fix the shoreline,under an emergency authorization issued by the authority authorization issued by the authority; <br /> provided that the structure or public facility is at risk of immediate damage from <br /> shoreline erosion as determined by the Department,in consultation with appropriate <br /> -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.