My WebLink
|
Help
|
About
|
Sign Out
Home
PD Background Report (PL-SMA-2022-000025)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-04-06 Windward
>
Item #2 Hawaiian Ola Brewing Corp. (PL-SMA-2022-025)
>
PD Background Report (PL-SMA-2022-000025)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2023 4:24:31 PM
Creation date
3/28/2023 2:06:36 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
3/20/2023
Other Parcel Numbers
260150020000
Permit Number
PL-SMA-2022-000025
Parcel Number
260150010000
Description
PD Background Report (PL-SMA-2022-000025)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table of Contents: <br />Introduction Pages <br />a) Cover sheet with 2022 image of Wainaku Building <br />a.1) Reverse page cover sheet with circa 1925 image of Wainaku Building <br />b) Introduction Letter to Planning Director and Windward Planning Commission <br />c) Table of Contents <br />Special Management Area Use Permit Application <br />1. Filing fee of five hundred dollars ($500.00) Paid through EPIC. <br />2. Original completed and signed Application form attached <br />3. Background Information on the SMA subject request: <br />A. EIS/EA under Chapter 343 HRS, request of waiver <br />B. Detailed written description of the proposed project and statement of objectives and <br />reasons for the request. <br />1. Grading and Excavation work... <br />a. Exhibit 3-B-1.a, Sanborn map dated 1921, "Hill to be Leveled for new <br />warehouse" <br />b. Exhibit 3-B-1.b, Sanborn map dated 1926. Showing warehouse on former hill. <br />c. Exhibit 3-B_1.c, Aina Engineers Site Plan (SP-1 and SP-2) for proposed project <br />under consideration of this application. <br />d. Exhibit 3-B-1.d, Aina Engineers Grading Plan (C-1) for proposed project under <br />consideration of this application. <br />e. Exhibit 3-B-1.e, Expanded view of Grading Plan (C-1) with annotations. <br />2. Installation of new Wastewater System... <br />a. Exhibit 3-B-2.a, Expanded view of Wastewater system with annotations. <br />3. Renovation of interior of existing building for Restaurant, Bar and Distillery... <br />a. Exhibit 3-B-3.a, Floor Plan of planned renovations by Alayna Kilkuskie. <br />C. Description of the Subject Property, Describe existing uses, structures and topography... <br />a. Exhibit 3-C-1.a, TMK Plat map, 2-6-015, with parcels outlined in red. <br />b. Figure 1, Project Site Location map (embedded). <br />D. Valuation of the proposed use, activity or operation... <br />
The URL can be used to link to this page
Your browser does not support the video tag.