My WebLink
|
Help
|
About
|
Sign Out
Home
PD Background Report (PL-SMA-2022-000025)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-04-06 Windward
>
Item #2 Hawaiian Ola Brewing Corp. (PL-SMA-2022-025)
>
PD Background Report (PL-SMA-2022-000025)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2023 4:24:31 PM
Creation date
3/28/2023 2:06:36 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
3/20/2023
Other Parcel Numbers
260150020000
Permit Number
PL-SMA-2022-000025
Parcel Number
260150010000
Description
PD Background Report (PL-SMA-2022-000025)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Reasons for the Request: Hawaiian Ola Brewing Corporation has been searching for a <br />property with Industrial zoning to accommodate its expanding business profiles and <br />growth. Expansion into restaurants, bars, pubs, brewing, and distilling are all allowed uses <br />within the Industrial zone. Hawaiian Ola Brewing Corporation learned in late 2021 that the <br />Edmund C. Olson Trust No.2 was going to sell its Wainaku Ventures, LLC properties. The <br />MG-5a and MG -la zoning of the properties met the objective of the Corporation. In <br />February 2022 Hawaiian Ola Brewing Corporation closed on the sale. The proposed use of <br />the building will be limited to a restaurant, Bar, and Micro -Distillery. Brewing of beer will <br />not be performed at this site. <br />3. Timeframe and Cost: Applicant Hawaiian Ola Brewing Corporation respectfully asks that <br />it be given a period of five (5) years to complete the development objectives stated in this <br />application. The development will be completed in "phases" with Phase 1 being the interior <br />re -design and renovation work to accept the new micro -distillery equipment; restaurant <br />kitchen, and other related infrastructure. It is expected that the micro -distillery will become <br />fully operational in Phase 1. The growing crops of Ki (Ti Leaf) are maturing rapidly at <br />Ola's field station in Laupdhoehoe and may soon be ready for processing. Phase 2 will <br />consist of the grading and excavation of the large hill side on the west of the building <br />including the installation of the waste -water system and expanded parking stalls. Should <br />the concrete flume structure be approved for demolition (or deemed to be repaired), that <br />may take place in Phase 2. Phase 3 will move into completion of the restaurant to provide <br />service to our guests. Phase 4 will complete the Bar service area and the tour/tasting <br />experience of the distilled spirits. The phased development will assist in development cash <br />flow and expense management. The estimated cost of the project $2.0 million dollars. <br />4. Special Management Area: The properties are in the Special Management Area and <br />subject to HRS Chapter 205A objectives and policies. Public Access to Ale`ale`a point for <br />shoreline fishing purposes will be improved from that of the previous owners. Hawaiian <br />Ola Brewing Corporation through its recently amended SMA Minor permit approved July <br />25, 2022, commits to improving the trail conditions and perfecting the conditions of SMA <br />-367 issued Sept. 1996, that required then applicant C. Brewer & Company, Ltd. to execute <br />and record a Public Access easement in favor of the County of Hawaii for access to <br />Ale`ale`a Point. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.