My WebLink
|
Help
|
About
|
Sign Out
Home
PD Background Report (PL-SMA-2022-000025)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-04-06 Windward
>
Item #2 Hawaiian Ola Brewing Corp. (PL-SMA-2022-025)
>
PD Background Report (PL-SMA-2022-000025)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2023 4:24:31 PM
Creation date
3/28/2023 2:06:36 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
3/20/2023
Other Parcel Numbers
260150020000
Permit Number
PL-SMA-2022-000025
Parcel Number
260150010000
Description
PD Background Report (PL-SMA-2022-000025)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
28. Water: Water from the County of Hawaii Department of Water Supply is on site. The <br />water source is from an 8" mainline off Wainaku Street. There are two service lines that <br />are upon parcel 002, 1) 2" Potable water with service meter, and 2) a dedicated Fire <br />Protection service line. Both lines begin at parcel 002, crossing the lot then proceeding <br />under H-19 in a concrete culvert easement granted in favor of the parcels from the State <br />Department of Transportation. Fire protection, life safety, and appliances were installed in <br />the Wainaku Building following the Fire Code and the manual fire alarm levers, automatic <br />sprinkler systems and smoke alarms are all connected to a server that automatically notifies <br />the Fire Department if any of these systems are activated. A Fire Hydrant with safety <br />bollards was installed just outside the building next to the slope to be excavated for <br />additional parking and wastewater system. This will result in the hydrant being relocated. <br />Applicant Hawaiian Ola Brew Corporation will consult with the Fire Department staff on <br />the best location following the guidelines of section 10.207 of the Fire Code. According to <br />comments received by the Department of Water Supply, the applicant will be required to <br />submit estimated maximum daily water usage calculations for the proposed project for <br />review and approval by DWS. Additionally, it was stated that the existing 8-inch waterline <br />within Wainaku St. is inadequate to provide the required 2,000-gpm fire flow, and as such <br />will coordinate any required upgrades (to conform with Chapter 18 of the Fire Code and <br />Chapter 26 of County Code) to the water system with the County Fire Department. <br />29. Wastewater: the applicant states that wastewater will be handled by extending the county <br />wastewater line to the main project parcel (001), as well as conducting pre-treatment of <br />wastewater on site as shown on site plans provided in the application. According to the <br />Department of Environmental Management (DEM) the applicant is currently working with <br />DEM to develop a sewer engineering plan for the subject parcels that would include a <br />sewer extension that would connect to the subject parcels to the Hawaii County Sewer <br />System. A written proposal for the proposed sewer line extension was submitted by an <br />agent for the applicant (Engineering Partners) and includes a proposed project description, <br />alternatives, and recommendations; staff notes that the submitted proposal does not include <br />the on -site pre-treatment of wastewater. Comments were provided by the State Department <br />of Health (DOH) which stated that the "DOH has no records of an existing cesspool and <br />no records of a septic tank system"; staff notes that the applicant provided evidence of an <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.