My WebLink
|
Help
|
About
|
Sign Out
Home
PD Recommendation Report (PL-SPP-2023-000031)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-04-06 Windward
>
Item #3 Ke'Aloha Lani LLC (formerly Hawai'i Brewery Development Co., Inc.) (PL-SPP-2022-031)
>
PD Recommendation Report (PL-SPP-2023-000031)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2023 12:59:49 PM
Creation date
3/31/2023 12:59:44 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
3/21/2023
Related Permits
SPP 842
Other Parcel Numbers
161400270000;161410280000
Permit Number
PL-SPP-2022-000031
Parcel Number
161410240000
Description
PD Recommendation Report (PL-SPP-2023-000031)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Road)(TMK: 1-6-141: 022) harmless from and against any loss, liability, claim or <br /> demand for the property damage,personal injury and death arising out of any act <br /> or omission of the applicant, its successors or assigns, officers, employees, <br /> contractors and agents under this permit or relating to or connected with the <br /> granting of this permit. <br /> 3. Final Plan Approval of the brewery, distillery and soft drink bottling facility shall <br /> be secured from the Planning Department. Plans shall identify existing and <br /> proposed structures,paved (concrete or asphalt-concrete) driveway and parking <br /> areas associated with the proposed use. Appropriate landscaping shall be <br /> provided for the purpose of mitigating any noise and visual impacts which may be <br /> generated by the facility. <br /> 4. Construction of the proposed brewery, distillery, or bottling facility and related <br /> improvements on one of the lots covered by TMK: 1-6-141: 024, 027, & 028 shall <br /> be completed, and a certificate of occupancy issued before October 18, [242-3] <br /> 2028. Further construction on the remaining two lots shall be completed, and <br /> certificate of occupancy issued before October 18, [242-8] 2033. Prior to <br /> establishing a use permitted under the existing FA-2a zoning, an amendment to <br /> delete the affected lot or portion thereof from the Special Permit shall be filed <br /> with the Planning Department. A recorded instrument informing all three lot <br /> owners of this conditional use requirement shall be filed with the Planning <br /> Department [t3fief te t4e eeiiveyanee ef any ef t4ese lets] within 180 days of the <br /> effective date of this amendment. <br /> 5. Access to the subject property shall meet with the approval of the Department of <br /> Public Works. The [fit] Applicant shall provide pavement improvements <br /> within the entire length of the roadway stub (Easement 409 & 412) in a manner <br /> meeting with the approval of the Department of Public Works,prior to the <br /> issuance of a certificate of occupancy for the proposed development. <br /> 6. The Applicant shall provide maximum daily water usage calculations prepared by <br /> a professional engineer licensed in the State of Hawaii and a water commitment <br /> deposit in accordance with the"Water Commitment Guidelines Policy" shall be <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.