Laserfiche WebLink
SONG:Right, we have no objection to that. <br />GALDONES:Commissioners are there any questions of Ms. Song or the <br />representatives? Commissioner Siracusa? <br />SIRACUSA:I just wanted to comment that if we€re deleting Condition number 4 <br />because since it€s already the law it€s redundant then all the other conditions after that have to be <br />renumbered as a matter of housekeeping. <br />GALDONES:That€s correct. Commissioner Graham? <br />GRAHAM:Before Norman spoke to us about what the time requirements were on the <br />original SMA 276 and I notice here on Condition 15 on the SMA permit we have an initial <br />extensionoftimefortheperformanceofconditionsmaybegrantedbythePlanningDirectoretc. <br />But when I look at the prior conditions I don€t see any time conditions maybe I€m missing <br />something. <br />SONG:Mr. Graham I think I can answer your question. Are you asking about the <br />original SMA permit? <br />GRAHAM:No I€m asking about the current one. <br />SONG:Oh. <br />GALDONES:Norman will you be able to address that? <br />GRAHAM:The question was where are the time conditions on the current one I don€t <br />see them in the conditions here. <br />HAYASHI:Oh you mean the current SMA? <br />GRAHAM:The current SMA. <br />HAYASHI:SMA 276? <br />GRAHAM:Not 276- <br />HAYASHI:You mean the proposed? <br />GRAHAM:I€m asking the one that we€re acting on today the SMA 04-009. <br />HAYASHI:I think we need to refer back to the proposed zone change conditions <br />because some of the time conditions are required. If you notice Condition C of the zone change <br />it says construction of the proposed development shall be completed within 5 years. So that€s <br />EXHIBIT E <br />11 <br /> <br />