Laserfiche WebLink
APPLICANTS REQUEST <br /> • Convertthe existing Wainaku Center into amicro-distillery, restaurant, and bar. <br /> • Grading and excavation of a large hill on the west side of the building to allow for <br /> additional parking as well as the various wastewater subsurface structures. <br /> • Installation of a new wastewater system, including connections to county sewer <br /> lines and on-site wastewater pre-treatment equipment. <br /> • Installation of safety fencing, related development, and other appurtenant <br /> structures on the subject property to support the new uses. <br /> • Additional work includes: <br /> • Re-design and renovation to convert the existing Wainaku Center building to <br /> accept the new micro-distillery equipment, restaurant kitchen, and other <br /> related infrastructure. The first floor will house the micro-distillery and <br /> agricultural processing facility while the second floor will serve as the bar and <br /> restaurant. <br />