My WebLink
|
Help
|
About
|
Sign Out
Home
2009-08-11 Kailua Village Design Commission Minutes
PublicDocuments
>
Planning Department
>
Kailua Village Design Commission
>
Minutes
>
2006-2024
>
2009
>
2009-08-11 Kailua Village Design Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 4:22:47 PM
Creation date
6/13/2011 4:22:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
she chose was the better of the two. She said the enclosure was <br />elevator parapet. She showed photographs of various rooftops in <br />out a hotel that had a similar roof and with a parapet on top. <br />examples of buildings that didnÓt have sloping roofs according t <br />Kona, and then showed a building along Waterfront Row which had <br />rooftop with clearstory windows. <br /> <br />Ms. Mettler said she responded to Ms. NewlonÓs request for a sim <br />fiberglass enclosure by going back to the architect with some su <br />use of matching roof tiles were ruled out due to their weight, s <br />98 percent, and that the use of fiberglass for eaves would incre <br />the antennas cannot be blocked in any way, which would result in <br />noted that they already have to reinforce the rooftop to handle <br />telecommunication facility, so they cannot make it heavier. Ms. <br />other locations, such as LoweÓs, Safeway, the office building ab <br />building, and Walmart, and said she either received negative responses, no responses, or that <br />there was no room on their roof tops. She said that is the exte <br /> <br />Discussion <br /> <br />Commissioner Harris-Glade commented that they recently looked at a tower at the last <br />meeting by Verizon Wireless and wondered how many more towers th <br />be reviewing. Ms. Mettler responded that she did not know becau <br />frequency (RF) engineer, but as far she knows, this is the last <br />her for awhile. She explained that they do have capacity issues <br />growing, which why they requested the recently proposed cell towlai Road. <br />She said they also have one at Lunapule Road, and one in the Old <br /> <br />Commissioner Harris-Glade added that he received notice of a newlai <br />Road, near Huihui Ranch. Ms. Mettler responded that that was outside of the Village. <br /> <br />Commissioner Harris-Glade responded that we are seeing a proliferation of towers and no <br />one is giving them a master plan of where they are going to be l <br />seeing applications for them one at a time. He said that he wou <br />until legislation gets approved on how future towers are going t <br /> <br />Commissioner Coats said that would be a good recommendation to f <br />Department. She also commented that when it presented to the Co <br />only place it can be located, that it should not just be mechani <br />locations have first been looked at as options. <br /> <br />Ms. Mettler responded that she did look at other options, that t <br />asked what she can do to prove that is the case. Chair Coats re <br />see more discussion on the other options. <br />4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.