Laserfiche WebLink
The applicant proposed composition shingle roofing, horizontal siding and board & <br />batten siding. Ms. Newlon noted KVDC’s 2006 recommendation for this project that the <br />buildings use a Hawaiian design theme. <br />The project’s consistency with Master Plan recommendations as to scale, architectural <br />articulation of building exterior walls, and sloping roof lines. The Master Plan <br />recommendation for use of natural materials was also noted; the plans indicated vinyl <br />siding and composition shingle roofing materials. Chosen colors are from the Benjamin <br />Moore Historical Color Palette which KVDC recommends. <br />Commissioners sought clarification as to the colors of the siding, the distinctive <br />landscaping requirements for lands in the CV zoning district and the proposed tandem <br />parking stalls as to the applicant’s design and permissibility under the zoning code. <br />Labeling errors on the submitted plans were corrected by the applicant. Staff explained <br />that special bufferyard landscaping requirements exist where CV zoned lands abut lands <br />zoned in any residential zoning district. <br />Addressing questions as to use of tandem parking stalls, staff explained that the zoning <br />code specifically requires that all parking spaces be individually accessible, and that no <br />provision for tandem parking exists in the code. Several commissioners expressed the <br />desirability of tandem parking stalls when offered in addition to the minimum parking <br />requirements of the code, and suggested ways that such stalls might be found acceptable <br />under the Zoning Code. The nature and characteristics of “grass-crete” parking surfaces, <br />as proposed by the applicant for the deeper half of the tandem parking stalls, was <br />discussed by the commissioners and staff. <br />In response to questions concerning the presence of only one driveway connection with <br />Hualalai Road, staff explained that this was a result of a requirement by the Department <br />of Public Works that a driveway connection in this portion of Hualalai Road be placed <br />across from the location previously approved by the Department of Public Works for a <br />driveway planned for a future development on the opposite side of Hualalai Road, and <br />that this positioning made a second driveway connection infeasible for the applicant. <br />Staff confirmed that only one loading space is required under the zoning code for multi- <br />family residential sites of up to 150 dwelling units. <br />Applicant Presentation <br />Mr. Riehm introduced himself and Eric Leuteneker of Betsill Brothers Construction, Inc., <br />as the building contractor selected by the owner to construct the proposed development. <br />Mr. Riehm explained the developer’s design goals for this project, which included scaling <br />the project buildings to be compatible with that of buildings on other sites flanking the <br />development, avoiding large parking lots in favor of creating traditional street settings <br />wherever possible, and incorporating traditional architectural elements such as lanai, <br />dormers (for ventilation), hip roof lines, and textured-effect siding. <br />Mr. Riehm noted the plan provides for six different building styles among the fourteen <br />residential structures, and that the siding proposed for the buildings was not vinyl but <br />4 <br /> <br />