Laserfiche WebLink
Federal Aviation Administration and Federal Communications Commission. All <br /> exterior lighting shall be shielded. <br /> 12. Within 120 days of the permanent abandonment of the tower, the Applicant shall <br /> remove the tower and its antenna and accessory structures (including the <br /> equipment building and the fence), down to, but not including the concrete <br /> foundation. The Applicant shall immediately provide written notification to the <br /> Planning Director of the termination of the telecommunication tower and related <br /> improvements and the removal of all structures. <br /> 13. An initial extension of time for the performance of conditions of the permit may <br /> be granted by the Planning Director upon the following circumstances: <br /> A. Non-performance is the result of conditions that could not have been <br /> foreseen or are beyond the control of the Applicant and that are not the <br /> result of their fault or negligence. <br /> B. Granting of the time extension would not be contrary to the General Plan <br /> or the Zoning Code. <br /> C. Granting of the extension would not be contrary to the original reasons for <br /> the granting of the permit. <br /> D. The time extension granted shall be for a period not to exceed the period <br /> originally granted for performance (i.e., a condition to be performed <br /> within one year may be extended for up to one additional year). <br /> 14. Should any of the conditions not be met or substantially complied with in a timely <br /> fashion,the Director may initiate procedures to revoke this permit. <br /> -11- <br />