My WebLink
|
Help
|
About
|
Sign Out
Home
.PD RECOMMENDATION REPORT
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-05-19 Leeward
>
Item #1 Kona Aerial Gymnastic Team, Inc. (SPP-21-000227)
>
.PD RECOMMENDATION REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2021 12:40:29 PM
Creation date
9/15/2021 12:40:19 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
7/26/2021
Permit Number
SPP-21-000227
Parcel Number
750170440000
Description
PD RECOMMENDATION REPORT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
estimated daily water usage calculations for the proposed uses, in order to determine the <br /> appropriate service lateral and meter size required. DWS has additionally informed the <br /> applicant that the existing 8-inch waterline within Hualalai Road is inadequate to provide <br /> the required 2,000 gallons per minute flow for fire protection. DWS has suggested that the <br /> applicant work with the Fire Department to determine an alternative solution. According <br /> to the applicant water is collected from roof runoff which is stored in two existing <br /> catchment tanks and used only for irrigation purposes. Additionally, according to the <br /> applicant, they have prepared plans for the installation of a 6-inch lateral and fire hydrant <br /> located approximately 70 feet from the existing structure to be used for the proposed use. <br /> According to the applicant,the lateral and hydrant are served by a 16-inch main and should <br /> have ample flow to meet DWS requirements. Additionally, the applicant understands that <br /> a reduced pressure backflow prevention assembly may need to be installed. <br /> Public sewer is not available to the site, therefore a Department of Health approved <br /> wastewater system will be required for the proposed project once wastewater generation <br /> calculations are provided to DOH. The applicant has stated that the applicant and <br /> landowner are working with a civil engineer to secure proper permits, approvals and <br /> inspections for the existing septic system. The preceding will be added as conditions of <br /> approval. <br /> Portions of the property, including the existing warehouse structure, are located <br /> within Zone X, an area determined by FEMA to be outside the 500-year flood plain. Other <br /> areas of the property are located within areas designated by FEMA as Flood Zone AE, <br /> defined as a Special Flood Hazard Area that can be inundated by a 100-year flood (1°o <br /> chance of occurring within the Zone X area). According to the Department of Public <br /> Works, Engineering Division, the 60-foot wide roadway corridor that provides one of the <br /> access routes to this facility does cross through Flood Zone AE. Any work in Zone AE like <br /> the placement of gravel for maintenance or paving the driveway would require either a <br /> "No-Rise Certification" or a Letter of Map Revision from FEMA, no matter the volume of <br /> material being moved. The preceding will be added as conditions of approval. <br /> There should be no other impacts to public services due to the proposed project. <br /> The site is currently serviced by police and fire facilities that are located less than five (5) <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.