My WebLink
|
Help
|
About
|
Sign Out
Home
SPP-21-000227 10.28.2021 SUPPLEMENTAL INFO FROM APPLICANT
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-05-19 Leeward
>
Item #1 Kona Aerial Gymnastic Team, Inc. (SPP-21-000227)
>
SPP-21-000227 10.28.2021 SUPPLEMENTAL INFO FROM APPLICANT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2021 12:59:34 PM
Creation date
11/1/2021 10:09:19 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
10/28/2021
Related Permits
SPP-21-000227
Parcel Number
750170440000
Description
LAND PLANNING HAWAII LLC, SUPPLEMENTAL INFO FOR LPC FOR KONA AERIALS\\ added in epic 11/1/21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Green 'Aina Planning & Engineering No Rise Report Bolton Access Road <br />Executive Summary <br />For the Kona Aerials facility, there is no grading work, and no structures are <br />proposed within the floodway. The work consists only of surface improvements <br />to the existing driveway that crosses the flood channel; therefore, it will have no <br />impact upstream or downstream in a flood event. <br />Since no grading or net elevation changes are proposed. Green 'Rina has <br />concluded that the work will have no impact on any flood event and certifies <br />that there will be "No Rise". <br />Research & Determination <br />The State of Hawai'i Flood Hazard Assessment Report (Exhibit A) shows that the <br />subject property is situated in an AEF Zone, defined as: "Floodway areas in Zone <br />AE. The floodway is the channel of stream plus any adjacent floodplain areas that must <br />be kept free of encroachment so that the 1% annual chance flood can be carried <br />without increasing the BFE." <br />Green 'Rina has determined that the proposed improvements will have no <br />impact on Base Flood Elevations or properties in the vicinity of the work. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.