Laserfiche WebLink
The purpose of that is that if Hualalai Vistas is constructed or developed and Smith€s <br />property does not go through, we do have a grant of easement through his property that <br />Hualalai Vistas can construct to Church of God Road. So there won€t be anything that <br />will stop the development of the road to connect to Church of God Road so that Hualalai <br />Vistas can comply with their condition in their ordinance. <br />If something does happen and access is not provided through Smith€s property to <br />Hualalai Vistas, they will be required in Condition F to have to construct to dedicable <br />standards the roadway of their entire frontage from, of their property all the way east to <br />the intersection at Mamalahoa Highway to County standards. So that€s the other option. <br />Now, it appears that things are being resolved through Hualalai Vistas and the Tom <br />Smith property to provide access via those roadways. <br />Again, we have received numerous letters; and I€ve recently passed out two that we€ve <br />receivedthismorning. <br />ThePlanningDirectorisrecommendingafavorablerecommendationofboththeState <br />Land Use Boundary Amendment and the Change of Zone to the Planning Commission. <br />FUJIKAWA:Any questions, Commissioners, with the staff? Graham? <br />GRAHAM:Just a quick one, Jeff. I hope I didn€t miss this, and it was in your <br />presentation somewhere. But I know some of the letters we got people were concerned <br />about the timing that if, in fact, this project were to move ahead before the Hualalai <br />Vistas one gives the access that whatever kind of heavy equipment would need to come <br />in has to come down to Church of God Road; and they€re concerned about the impacts on <br />that. Do you have anything to offer in that regard? <br />DARROW:The Hualalai Vistas is proposed to develop first. Now as far as, I <br />spoke to the Director briefly about this, maybe he can be able to speak about it. But it <br />appears that, I€m not sure we€re in a situation where we can limit them from being able to <br />bring in equipment a certain way. We can, you know, hopefully be able to have them <br />bring it in through Hualalai Vistas. They€re going to be in a process of doing <br />construction shortly. They€re just waiting for the subdivision approval to go forward to <br />get their grading permits. So they€re in the process of being able to go forward. At the <br />same point, we can try to work with the Applicants to be able to bring the construction <br />through Hualalai Vistas to the road. Church of God Road, obviously, is not constructed <br />in a manner that you would even be feasible to bring heavy equipment down that road. <br />GRAHAM:Thank you. <br />FUJIKAWA:Any other questions, Commissioners? Chris Yuen? <br />YUEN:You know, we don€t have a specific condition on that point of <br />construction equipment, but I think we could add a condition. The basic concept is that <br />Hualalai Vistas would develop first and that, and then the Smith property; and the Smith <br />3 <br /> <br />