Laserfiche WebLink
going to be done by Mr. Smith? Somebody is creeping up on me here. Oh. So, what <br />would normally happen there, Mr. Yuen, who would pay for that? <br />YUEN:The person doing the development. <br />TYLER:Oh, boy, does Mr. Clever know that? And how is he going to get <br />credit for this, through his fair share? <br />YUEN:Well, if he develops this connection per our letter, we will credit <br />him against the fair share, because then he€s making an improvement to the regional, <br />public regionalinfrastructure. <br />TYLER:Right. Okay. I hope everybody is listening carefully here, and <br />we€ll all try to remember this when it comes to the Council. Okay. Now, there was a <br />secondquestionraisedbysomeofthespeakerstodayaswellassomeofthosewho <br />communicated to you that what access is Mr. Smith going to have during construction? <br />And this is a very important point because the County refuses to repair and maintain this <br />road. They call it road in limbo;‚ and, as we all know, the only limbo part of it is on the <br />County side, it€s not from the State side. And their refusal, as you heard me say in the <br />beginning and I won€t get back on my high horse, has really endangered anybody that <br />uses this road, anybody, including me who has gone down there to check this situation <br />out. And if you go down there, and I hope you will, you€ll take your life in your hands if <br />you have to make a left turn in or out, especially out. <br />So the use of this road by construction, heavy construction equipment should not be <br />permitted. I don€t know what else to say except that maybe he can€t start until the <br />roadway is completed and access is completed, the alternate access is completed out to <br />Highway 190. But this cannot take a Low Boy. It can€t take, you know, any kind of <br />heavy equipment. And I would say the only possible way that that would happen is if the <br />County improves and maintains that road prior to his using it, which they have already <br />told me, the County has already told me time and time again, year after year, they€re not <br />going to do because they can€t just choose one road. Yet the County continues to want to <br />approve the uses down here. Mr. McClure was quite surprised when I told him there was <br />a subdivision down here at the bottom. Anyway, I mention this because I really think <br />you need to resolve this before you move it out of your, move it out of the Planning <br />Commission and come to the Council. <br />Condition No. F on page 2 of the proposed Director€s conditions says that if access can€t <br />be obtained that they will, Mr. Smith will improve the Church of God Homestead Road <br />to County dedicable standards. That is a physical impossibility. As Director Yuen said it <br />can€t happen. And I hate to be so, sound so pessimistic and cynical, but it€s too steep, <br />No. 1; No. 2 is the right-of-way is too narrow; No. 3 is that both walls are archaeological <br />sites and cannot be moved or touched, and they have told other adjacent landowners that <br />they couldn€t do this. And they told Mr. Kabumoto that, I can tell you that. He had to <br />get the archaeologist to come out there. So I really think it€s not only a physical <br />impossibility, it may be a legal impossibility. And, so, I don€t think that that option <br />30 <br /> <br />