Laserfiche WebLink
The other option, as the Planning Director had indicated, allows, you know, in the event <br />Hualalai Vistas does not develop, you know, for its own reason, does not develop in a <br />timely manner and Mr. Smith wishes to develop his property in advance of Hualalai <br />Vistas coming on line, then the other option, as the Director mentioned, is that he can <br />develop it, but he has to improve Church of God Road to full County dedicable standard. <br />And that I think, and I would tend to agree with the Director that it would really not be a <br />realistic alternative. Because given the cost involved to improve Church of God Road, <br />bring the waterline and, you know, only for a six- or seven-lot subdivision, it just doesn€t <br />balance out, combined with the fact that the existing road right-of-way of the Church of <br />God Road, you know, ranges from about 20 to 35 feet and the required County dedicable <br />standard calls for 50-foot right-of-way, which means now Mr. Smith would have to <br />condemn properties or find means to acquire, you know, additional land to make it, you <br />know, a full dedicable standard roadway. <br />So,ultimately,whatwillhappenisthatifHualalaiVistasisnotdeveloped,thenprobably <br />Mr. Smith would not develop, you know, knowing that the only way he can develop his <br />property is to do the Church of God Road highways, improvements rather. <br />So I think the pro-active way, and in addition to that, what the Department is saying is <br />that, and to which Mr. Smith is agreeing to, is that there€s also the possibility that <br />Hualalai Vistas may develop. And if for some reason Mr. Smith may not want to develop <br />his property, I don€t know -. But if Mr. Smith chooses not to develop his property, what <br />the County is requiring and Mr. Smith is agreeing to is that he will nonetheless provide a <br />50-foot wide easement through his property that would connect Hualalai Vistas with the <br />Church of God Road. So, at some point in time, then the County would be in a position <br />to improve this small little section and, in so doing, provide access to the people who <br />presently use Church of God Road to get through Smith€s property, and ultimately <br />through Hualalai Vistas. You know, it provides an alternative relief. <br />YUEN:No, that€s, actually, it€s a little bit farther than that. As part of the <br />subdivision approval for Hualalai, if Hualalai Vistas goes first and Smith is not <br />developing, as part of the subdivision approval for Hualalai Vistas, they have to build that <br />road -. <br />FUKE:Oh, okay. <br />YUEN:To Church of God Road over that easement. <br />FUKE:Through this easement? <br />YUEN:Right. <br />FUKE:Got you. <br />YUEN:And the conditions of the rezoning for Hualalai Vistas are that <br />these connector roadways have to be built to County dedicable standards and dedicated to <br />6 <br /> <br />