Laserfiche WebLink
Mamalahoa Highway; and the location of the property is outlined in black. It’s the larger <br />property outlined in black on the slide; and the proposed location of the telecommunication <br />tower is shown by a red dot here close to the highway. As I mentioned it’s about 1300 feet <br />mauka of the highway. The State Land Use designation as you know is Agricultural and the <br />town of Paauilo is designated Urban by the State Land Use Commission. <br />This is an aerial photograph of the site and, again, the proposed tower site is outlined in red. It’s <br />just on the Hilo side of Paauilo Mill Road. The applicant has submitted an elevation showing <br />what the tower would look like once it’s constructed from ground view. And originally the <br />Department sent a recommendation to the Commission for denial. But since that time the <br />Department has met with the applicant again and clarified the signal coverage for the proposed <br />tower as well as the signal coverage for the tower that the Commission approved in June that <br />Cellco had applied for, which is located at about two miles on the Honokaa side of the proposed <br />request. So now we’ve changed our recommendation to an approval. <br />WOODWARD: Well, then that’s special. <br />COTTLE: Yes. You should also have received three letters this morning from Alii <br />Wireless Specialists and, I’m sorry, two letters, and AT&T. Are there any questions? <br />WOODWARD: All right. Any questions for staff? <br />DOMINGO: Mr. Chairman? <br />WOODWARD: Yes, Commissioner Domingo. <br />DOMINGO: I see the signal aspect has been settled by meeting with the applicant. And <br />one of the reasons for the recommendation for denial was that they had not explored the <br />possibility of co-location, another reason is that the land was also identified as Prime <br />Agricultural land. And having settled the issue about the signal, then my question is what about <br />the other issues given that prompted the denial action? <br />COTTLE: Are you referring to the -? <br />DOMINGO: You folks are withdrawing all those comments in total or you’re just <br />saying that you approve it because you’ve met with the applicant and determined that everything <br />is settled by your meeting? But, you know, I’m just wondering, the other reasons for denial as <br />specified in the recommendation, you know, are they still valid, or would that need to be put <br />aside? <br />COTTLE: Well, the primary reason for the denial originally was the co-location <br />issue. Since that time Anthem has brought to our attention that they provided information that <br />they provide telecommunication infrastructure. They build the towers, and they are not actually <br />a wireless service provider, which is why they aren’t going to co-locate, because they aren’t a <br />service provider, they just provide towers. So that issue was resolved. The signal issue was <br />2 <br />EXHIBIT B <br /> <br />