My WebLink
|
Help
|
About
|
Sign Out
Home
PL-USE-2022-000006 J. PRIES TESTIMONY (LATE) 05.18.23
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-05-19 Leeward
>
Item #2 Renegade Towers, LLC (PL-USE-2022-000006)
>
Additional Info Provided to LPC for Consideration at 5-19-23 Hearing
>
PL-USE-2022-000006 J. PRIES TESTIMONY (LATE) 05.18.23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 6:18:19 AM
Creation date
5/19/2023 6:18:17 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
5/18/2023
Permit Number
PL-USE-2022-000006
Parcel Number
730020100000
Description
PL-USE-2022-000006 J. PRIES TESTIMONY (LATE) 05.18.23
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Other questions: <br /> 5G: <br /> Is this tower intended to be 5G,now or in the future?What is the County's stance on this? <br /> Coverage maps: <br /> We are lay people- so forgive our ignorance here but the maps are hard to decipher.Are the <br /> commissioners able to view the provided coverage maps and determine that the proposed tower would <br /> provide more than a nominal increase in range and service that it warrants placing it in this location? <br /> Monopole: <br /> Other than the simulation photos that show the monopole in the distance, can the applicant provide a clear <br /> photo of what a monopole looks like with four carriers'equipment installed on it? <br /> Microwave dish: <br /> The application states this tower might need a microwave dish installed on it if there is no fiber optic <br /> available to the site.Where on the tower would this be located?How does that impact the look of the <br /> monopole? <br /> Road-in-limbo: <br /> Donahue Road is a road-in-limbo. In the event that the construction of this tower negatively impacts the <br /> road,who will repair it? It is a public road that neither the State nor the County maintains.Are there other <br /> utilities on the Big Island on such roads? <br /> We realize the hearing is tomorrow,but we wanted to thoroughly read all the background information <br /> before submitting our testimony. <br /> Like everyone else,we view cellular service and internet access as a key utility.We also believe that <br /> thoughtful, long-term planning is key to preserving the look and feel of our community. Thank you for <br /> considering our concerns and the impact of such intensive utility projects on the character of Kona's <br /> neighborhoods.We ask that the Leeward Planning Commission refrain from approving this application. <br /> Thank you, <br /> Emily and Gary(Joe)Pries <br />
The URL can be used to link to this page
Your browser does not support the video tag.