Laserfiche WebLink
Takase: Mr. Chairman, the applicant mailed 1 out of 1 notice within 100 feet, 1 out of 1 <br />notice within 500 feet. There was 1 property entitled to protest, there were no protests <br />to this application. <br />Ibarra: Thank you. Any public testimony on this matter? <br />There was no public testimony. <br />Ibarra: There be none. Commissioners, any questions or discussion? <br />Wilkinson: Commissioner Wilkinson, I have a question. <br />Chu: Sure. <br />Wilkinson: How far along are you with this building, it looks like it hasn't been built. I'm <br />just curious when? <br />Chu: Yes, it's still under construction. Maybe I'll let Tom, who is the Project Manager, <br />update us on when you anticipate completion of the build out. <br />Conzelman: That's a great question. We are picking up speed, the building is now <br />watertight, interior walls are going in, all the infrastructure is done, site improvements <br />are happening, and if you'd like, I can give you a 30 second video of what the latest <br />looks like, if you're interested in seeing it. <br />Wilkinson: Yes, please. <br />Chu: Yes, they would, Tom. <br />Conzelman: Alright, standby one second. You can see the roof is on, the lanai at the <br />bottom of the screen is covered and out, those columns you see in white are locally <br />sourced ohia columns. They are covered now for protection, the building has been <br />waterproofed, and probably not as visible from this video, but the grading for the site <br />improvements are done, the retaining wall in the back and the decorative wall is done. <br />Wilkinson: So, when do you estimate it will be complete? <br />Conzelman: September of this year. <br />Wilkinson: I also noticed you said they plan to cultivate a lot of the ingredients on the <br />property. Are those plants already there, or will you be sourcing outside for that to <br />start? <br />Conzelman: That's a great question, it's the latter, the actual coffee plant itself is still <br />TBD'ers (to be determined), and different types of plants, and while we have the <br />infrastructure for irrigation, and we have some very sophisticated water reuse systems <br />for irrigation, the actual plant itself is still TBD (to be determined). Thank you. <br />MINUTES - LIQUOR COMMISSION MEETING - THURSDAY, MAY 41 2023 - HILO PAGE 7 OF 46 <br />