My WebLink
|
Help
|
About
|
Sign Out
Home
2003-07-18 tnextel
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2003
>
2003-07-18 tnextel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 8:33:50 AM
Creation date
6/14/2011 8:33:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CRITTENDEN:Sure. <br />FUJIKAWA:Okay. Thank you. The Applicants, please stand forward <br />guess thereÓs no one from the general public who wanted to testify. Okay. Any of you <br />testifiers, do you have any comments, any questions? <br />FUKE:No, I think that would, weÓre just waiting for what the Planning <br />Director may have so they can respond to them. <br />FUJIKAWA:Okay. Commissioners, none? Go ahead, Planning Director. <br />YUEN:I just had some questions about and the possible use of the <br />American Tower that was approved by the Commission in Laupahoehoe; and as I refer <br />back to the site map, itÓs either that large red dot or the small blue dot. I think it is the <br />blue dot, okay. ItÓs the blue dot on the map; and if you see their proposed towers off on <br />the dot on the far right, itÓs about a mile-and-a-half away. When we had the application <br />from American Tower, they provided us with whatÓs called a propagation exhibit. And <br />their propagation exhibit said that that tower would provide coverage as far as Ookala, in <br />that direction. Ookala is about the, is about at the 30-mile marker, and then it would <br />provide coverage about, between Laupahoehoe and Malua Gulch in the Hilo direction, <br />about to the 23-mile marker. And I was asking the Applicant for their propagation <br />exhibit to try to understand what the problem would be using the American Tower. <br />When American Tower applied for that, they did say that Nextel had expressed an <br />interest in using that tower, so thatÓs my question on this. <br />FUJIKAWA:Mr. Jaeger, can you answer this to the question of the Director? <br />JAEGER:Yes, Chairman. Chris, Mr. Planning Director, sir, the tower that <br />has been permitted for American Tower is outside of what we cons <br />search ring. If you remember, one of the criteria that we used is to try to fill existing <br />holes within the Nextel network. And, in this particular case, the area to the north of <br />Laupahoehoe Gulch is what we consider to be our prime target area for our tower site <br />location. <br />We did look at the American Tower location and we did a propagation analysis on the <br />location. We thought that, we knew that it was about 2.5 miles <br />location and it was at about eight mile off of the highway and there was existing <br />vegetation there which would, we felt hindered the propagation characteristics from that <br />location. And thatÓs why we thought that it was not optimum for us to pursue that <br />particular site. <br />YUEN:With reference, where is your Paauilo tower site? <br />JAEGER:ItÓs on top, itÓs right in Paauilo town, and itÓs right on top of an <br />apartment building there Òcause itÓs a low height site. <br />16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.