Laserfiche WebLink
WATANABE:I have a question, Mr. Fuke. You mentioned that the current plans <br />say we were going to extend Laaloa as a mauka-makai connector to Ali`i Parkway, right? <br />FUKE:My understanding is that the County’s plan is to have that Laaloa <br />Street extension, yeah. <br />WATANABE:Yeah, which is, you know, directly, well, not exactly directly but in <br />close proximity to the subject property. But does that also mean that your project would <br />be able to have a north-south connector possibly to Laaloa so that there would be an <br />additional way out of that -? You see, I know that the County does not want to have an <br />abundance of intersections, they want to keep this as a highway; and I tend to agree with <br />that. But then in order to do that and in order for you, the residents of your subject <br />property, to have access to Ali`i Parkway, they’d have to have a north-south connector to <br />Laaloa. And maybe it’s not entirely within your capability to respond because, you <br />know, I don’t think it’s contiguous. <br />FUKE:But, nevertheless, in the interest of like connectivity, you know, <br />your Planning Director has been thinking along that line. Because if you look at <br />proposed Condition 5 that the Director has suggested there is a requirement that the <br />Applicant develop an access and circulation plan providing for inter-connection of <br />adjoining parcels. So that’s like a north-south type of connection. <br />WATANABE:Oh, that’s what this is referring to? <br />FUKE:That’s correct. That’s the condition that the Director is proposing <br />now. So there will be a requirement. And so it goes back again to my original comment <br />that what you see right now, you know, we’ve had to, it’s like an evolving thing. So what <br />you see right now is based upon all information we have. And then there’s public <br />comments, the agency comments; and if this project gets approved, there’s going to have <br />to be further massaging to reflect the kind of issues and concerns and the conditions that <br />the County will be approving. <br />WATANABE:Thank you. Mr. Rho? <br />RHO:Yeah. Also in this report, I’m not sure what to call it, but there’s <br />this Traffic Impact Analysis Report; and on Page 3, at the bottom of Page 3, it refers, that <br />whole paragraph talks about a State Department of Transportation traffic count that they <br />take every two years. And the period that I guess is used in your report is the period from <br />1982 to 2002. Am I reading that correct? <br />FUKE:Half correct, 1990 to 2002. <br />RHO:Oh, okay, 1990 to 2002, a 10-year period that they do this every <br />two years is my understanding. Right? <br />EXHIBIT C <br />10 <br /> <br />