Laserfiche WebLink
The applicant's proposed development does not strictly adhere to the exceptions <br /> for changing the current zoning in that it is not an agricultural cluster subdivision, and <br /> although the applicant will be required to meet the County Housing Code for providing <br /> affordable housing, the subdivision will include primarily market-rate lots. Additionally, <br /> the proposed 5-lot subdivision slightly exceeds the 4 lots or less minimum mentioned in <br /> the SKCDP. In 2021, when the applicant applied to change the state land use boundary <br /> district to urban and zoning to RS-10 for the southern portion of the property, the <br /> Leeward Planning Commission did not support the request because they believed the <br /> southern portion of the property should not be urbanized since it is situated in the area <br /> designated for small farms and ranches in the SKCDP. The current applications align <br /> more closely with the SKCDP related to preserving important open space and small <br /> farms and ranches in this area of Waimea. <br /> All essential utilities and services are available to the site. Access to the <br /> property is proposed via Mamalahoa Highway and Ishihara Farm Road. Mamalahoa <br /> Highway is a two-lane,paved roadway, striped with a two-way left turn lane in the <br /> median of the road, with an approximate 40-foot-wide pavement within a 50-foot right- <br /> of-way in this area. According to the Department of Public Works , Engineering Division <br /> (DPW), the section of Mamalahoa Highway fronting the subject property was transferred <br /> from County to State ownership in December, 2021 and is now State-owned and <br /> maintained. <br /> The existing dwellings on the subject site are currently accessed by Ishihara Farm <br /> Road, a private road over an approximately fifty-foot-wide combined easement within <br /> Lots 11-A-2 and 11-A-3 in favor of the subject property (Lot 11-A-1). The new <br /> residential lots will similarly be accessed by Ishihara Farm Road and by interior access <br /> easements. The applicant is proposing two new access points from Mamalahoa Highway <br /> to service the three proposed commercial lots with no vehicular access via Ishihara Farm <br /> Road for the proposed commercial use. <br /> A Traffic Impact Analysis Report(TIAR)was completed in September 2022 by <br /> The Traffic Management Consultant(TMC). The TIAR was designed to study current <br /> conditions of peak hour traffic data, evaluate traffic count data to establish existing traffic <br /> -5- <br />