My WebLink
|
Help
|
About
|
Sign Out
Home
PD Recommendation Report (PL-REZ-2023-041)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-07-07 Windward
>
Item 2 Dennis Schmitz (PL-REZ-2023-000041)
>
PD Recommendation Report (PL-REZ-2023-041)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2023 2:54:34 PM
Creation date
6/29/2023 2:54:14 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
5/11/2023
Related Permits
PL-SMA-2023-000029
Permit Number
PL-REZ-2023-000041
Parcel Number
390010240000
Description
PD Recommendation report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CSchmitzREZ.05/11/23 <br /> DENNIS SCHMITZ <br /> CHANGE OF ZONE APPLICATION (PL-REZ-2023-000041) <br /> CONDITIONS OF APPROVAL <br /> A. The applicant(s), its successor(s), or assign(s) ("Applicant") shall be responsible <br /> for complying with all of the stated conditions of approval. <br /> B. The Applicant shall be responsible for complying with all requirements of <br /> Chapter 205, Hawaii Revised Statutes, relating to permissible uses within the <br /> State Land Use Agricultural District. <br /> C. Prior to applying for the subdivision, the Applicant shall secure the necessary <br /> access and utility easements through the lands located mauka of the subject <br /> property. A copy of the proposed access and utility easements shall be submitted <br /> to the Planning Director for review and approval prior to recordation with the <br /> State of Hawaii Bureau of Conveyances, with a copy of the recorded document <br /> to be filed with the Planning Department. <br /> D. The Applicant is responsible for maintaining valid water commitments to support <br /> the proposed development until such time that required water facilities charges <br /> are paid in full. <br /> E. The Applicant shall construct necessary water system improvements as required <br /> by the Department of Water Supply, which may include, but not be limited to: 1) <br /> service laterals that will accommodate a 5/8-inch meter to front each lot, 2)water <br /> mains capable of delivering water at adequate pressure and volume under peak- <br /> flow and fire-flow conditions; minimum diameter of mains shall be six (6) inches, <br /> and 3) subject to other agencies requirements to construct improvements within <br /> the road right-of-way fronting the property affected by the proposed development, <br /> the application shall be responsible for the relocation and adjustment of the <br /> Department of Water Supply's affected water system facilities, should they be <br /> necessary. <br /> F. All development generated runoff shall be disposed of on site and shall not be <br /> directed toward any adjacent properties. A drainage study shall be prepared by a <br /> professional civil engineer licensed in the State of Hawaii and submitted to the <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.